My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT ORANGE COUNTY WATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
25B - AGMT ORANGE COUNTY WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:38:55 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JDK:bc: 10/10/88 <br />RETAILER shall be responsible for ensuring the accuracy of <br />the metering device. Any costs incurred in modifying the <br />size of existing RETAILER meters shall be the responsibility <br />of OCWD. The quantity of Project Water measured by the <br />meters to be owned, operated and maintained by RETAILER shall <br />be the sole basis for determining the quantity of Project <br />Water delivered and sold by RETAILER to each Project Customer <br />under Section Two of this Agreement. In the event that a <br />meter measuring the quantity of Project Water delivered by <br />RETAILER to a Project Customer indicates a lesser quantity <br />than OCWD's meter measuring the quantity of Project Water <br />delivered to RETAILER for resale to a Project Customer, OCWD <br />shall be responsible for the cost of such difference, and <br />RETAILER shall not be liable therefor. In the event RETAILER <br />has a separate metering device serving exclusively non - <br />potable uses on the premises of a Project Customer, OCWD may <br />sell Project Water to RETAILER by connecting the Project <br />Facilities distribution pipeline system directly to the <br />separate non -potable meter so long as the standards and <br />requirements of RETAILER and any other governmental agency <br />having jurisdiction over the quality of Project Water are <br />satisfied. <br />1.5 In order to avoid the risk that Project Water may <br />enter into RETAILER's potable water distribution system, OCWD <br />shall, at its own expense, install on RETAILER's potable <br />water system a backflow prevention device or devices approved <br />by RETAILER at a location or locations designated in writing <br />25B-9 <br />-,- <br />EXHIBIT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.