Laserfiche WebLink
Any repair or replacement costing less than 45,000.00 may <br />be done by force account. Repairs or replacements costing in excess of <br />$5,000.00 shall be subject to a public bidding process. <br />If, within 30 days.aftor notification, .the notified party <br />disagrees with the necessity or estimated cost or apportionment of the cost of <br />the repair or replacement, they shall so notify the other party in writing. If <br />the parties are unable to agree upon the need or cost of, the repair or replacement, <br />the matter may be submitted to arbitration as set forth in Section 4. <br />2. Future Sewers <br />It is anticipated that, as the tributary area to the shared sewers <br />continues to develop, there will not be adequate capacity, as defined in Section <br />1, in some of the shared sewers. Exhibit C attached hereto shows the sizes and <br />locations of parallel sewers and relief connections to orange County Sanitation <br />District facilities that are anticipated will be required in the future to <br />provide capacity for ultimate planned development. <br />On or before October 1st of each year, each party shall determine <br />whether the shared sewers within their jurisdication have sufficient capacity, as <br />defined in Section 1, to provide service without limiting connections for the <br />next calendar year. If it appears that adequate capacity will not be available, <br />then the parties shall meet and determine within 60 days the.size and estimated <br />cost of a parallel relief sewer that, together with the existing sewer, will <br />provide adequate capacity for ultimate planned development within the tributary <br />area. Each party shall provide the estimated ultimate flows for their portion of <br />the tributary area. <br />The cost of the new parallel sewer, including engineering, <br />administration and construction shall be apportioned between the parties equal to <br />25D-6 <br />4 of 6 <br />