My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - AGMT T.I.'S REPLACE PIPES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
65B - AGMT T.I.'S REPLACE PIPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:41:38 AM
Creation date
7/27/2017 4:54:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
65B
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 11, 2017 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza M-11 <br />Santa Ana, CA 92701 <br />RE: PRELIMINARY FID <br />Police Station <br />60 Civic Center Plaza <br />STATEMENT OF WORK; <br />To perform replacement of existing domestic recirculation of hot water piping. We will gain access to equipment cat walk areas <br />through existing access panels and through newly installed access panels that we will install as needed. <br />We will schedule with Building Engineers for needed shut downs on water piping as needed for disconnect of old and reconnect of <br />new piping. <br />Piping systems will be in operation at the end of each day. All work to be performed during standard work hours. <br />Work will start 2-3 weeks after approval and 6-8 weeks for completion. <br />o Provide and install approx. 220' of 2" type °L" copper pipe on the I' floor. <br />a Install (6) new ball valves at the appropriate locations. <br />• Provide and install approx. 240' of 1" type "L" copper pipe on the 3`a floor. <br />• Install (4) new ball valves at the appropriate locations. <br />• insulate all the new hot water lines with Mansville fiberglass Insulation. <br />• Includesall cleanup and debris removal. <br />Total $ 81,600.00 <br />• Provide and Install approx. 40' of 2" type "L" copper on 1" floor in boiler area. <br />• Provide and install (2) new ball valves in appropriate locations. <br />I Insulate all hot water piping with mansville fiberglass Insulation. <br />Total $ 12,050.00 <br />a Install needed access panels. <br />Total $ 50,350.00 <br />Grand Total $144,000.00 <br />NOTE: Attached are specs for valve's and pipe mounts and capper pipes. <br />The cost Includes prevailing wages <br />DIRfi1000038226 <br />3595 Cadillac Avenue, Suite 103 a Costa Mesa, California 92626 <br />(714) 4366- 214) 434-9324 <br />License Na. 965438 <br />
The URL can be used to link to this page
Your browser does not support the video tag.