My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - AGMT T.I.'S REPLACE PIPES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
65B - AGMT T.I.'S REPLACE PIPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:41:38 AM
Creation date
7/27/2017 4:54:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
65B
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
progress Insertion Depth Chart <br />Tube Size `/z"s,4"1 1/4 111 <br />2. <br />Insertion Depth 1/4' gill 7AII 1" 17 j'6. 19 1 �'6 <br />�' —6-19 jw <br />1� Read and understand all instructions <br />for Installing Vieffa ProPress fittings. Faf urs to follow all <br />Instructions may result in extensive property damage, <br />serious Injury or death. <br />1, Cut copper tubing at right angles using displacement - <br />type cutter or fine-toothed steel saw, <br />2. Remove burr from inside and outside of tubing to <br />prevent cutting sealing element. <br />3. Check seal for correct fit. Do not use oils or lubricants. <br />Use only Vioxia ProPrass Shiny Black EPDM or Dull <br />Black FKM sealing elements. <br />Note: For applications requiring Vlega ProPress with FKM <br />sealing elements, remove the factory -Installed EPDvI <br />sealing element and replace with FKM sealing element. <br />4. Mark proper insertion depth as indicated by the Viega <br />ProPress Insertion Depth Chart, Improper insertion <br />depth may result in Improper seal, <br />5. While turning slightly: slide ball valve onto tubing to the <br />marked depth. <br />Note: End of tubing must contact stop. <br />6. Insert appropriate Viega jaw into the pressing tool and <br />push in, holding pin until it locks in place. <br />7. Open the jaw and place at right angles on the valve. <br />Vlsually check insertion depth using mark on tubing. <br />8. Start pressing process and hold the trigger until the jaw <br />as engaged the valve. <br />9. After pressing, the jaw can be opened again, <br />Note, Only ball valves marked with NSF -61G are allowed for <br />use in potable water systems, <br />Leak Testing with Smart Connece: <br />Unforessed connections are located by <br />pressurizing the system with air or water. <br />When testing with water the proper pressure <br />range Is 15 pal to 85 psi maximum. Leak <br />testing with air can be dangerous at high <br />pressures. When testing with compressed air the proper <br />pressure range is Y2 psi to 45 psi maximum. Following a <br />successful leak test, the system may be pressure tested up <br />to 200 psi with al or up to 600 psi with water, if required by <br />local code requirements or project specifications. <br />'doge LLD, 12003 Airport Way, Ste, 395 - Broomfield, (30 60021 - Ph: 800-976-9819 - I= 800-976.9817 <br />SNI -PP 1116 Isar VaNes) <br />65B-22 <br />15 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.