My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO MUNI CODE CH 39 FEE FY 2017-2018
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
75A - PH - RESO MUNI CODE CH 39 FEE FY 2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:42:18 AM
Creation date
7/27/2017 4:54:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jmf 7/20/17 <br />Water Meter Cost and installation Fee Schedule <br />Meter size <br />Qty <br />Fee <br />*5/8" <br />Each <br />$69.54 <br />*a/» <br />Each <br />$89.99 <br />V <br />Each <br />$148.31 <br />1 1/2' <br />Each <br />$347.89 <br />2" <br />Each <br />$464.99 <br />*After business hours, the <br />charge for replacement <br />Minimum <br />$150.20 <br />C. Meter turn on or meter turn off fee during weekdays for new water turn on <br />services and delinquent accounts: $59.41 <br />D. Afterhours turn on or turn off fee during afterhours and holidays for new <br />water turn on services and delinquent accounts when requested by customer: $148.73 <br />E. Special investigation/meter reread fee when a meter box is inaccessible at <br />the time the routine meter read was attempted by the city or when consumption occurs in <br />connection with a previously turned off meter, or when requested by customer: $12.81 <br />F. Meter removal fee or meter resetting fee (to re -install meter when meter <br />was removed for non-payment or for violation of City Code): <br />Meter Removal Fee or Meter Resetting Fee Schedule <br />Meter size <br />Qty <br />Fee <br />*518" <br />Each <br />$69.54 <br />Each <br />$89.99 <br />1" <br />Each <br />$148.31 <br />1 %2" <br />Each <br />$347.89 <br />2" <br />Each <br />$464.99 <br />*After business hours, the <br />charge for replacement <br />Minimum <br />$150,20 <br />G, Meter test fee (when requested by customer): $110.04 <br />H. Temporary construction meter deposit: $1,193.10 <br />Resolution No. 2017 -XXX <br />Page 2 of 5 <br />75A-60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.