My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2017-08-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
FULL PACKET_2017-08-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2017 12:52:41 PM
Creation date
7/27/2017 4:59:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/1/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Notification and approval. The agency must be notified and approval must <br />be obtained from the agency before a device is removed. <br />(2) Removal in general. The use of a device may be discontinued and the <br />device removed from service upon presentation of sufficient evidence to the agency to <br />verify that a hazard no longer exists or is not likely to be created in the future. <br />(3) Removal for relocation. A device may be relocated following confirmation <br />by the agency that the relocation will continue to provide the required protection to satisfy <br />installation requirements. A retest will be required, prior to return to service, following the <br />relocation of the device. <br />(4) Temporary removal for repair. A device may be removed for repair or <br />service, provided water use is either discontinued until repair is completed and the device <br />is returned to service, or the service connection is equipped with backflow protection <br />approved by the agency. A retest will be required, prior to return to service, following the <br />repair or service of the device. <br />(5) Temporary removal for replacement. A device may be removed and <br />replaced, provided water use is discontinued until the replacement device is installed. All <br />replacement devices must be approved by the agency prior to being put into service and <br />must be commensurate with the degree of hazard involved. A retest will be required, prior <br />to return to service, following the replacement of the device. <br />(g) Water system survey. <br />(1) Plans and specifications must be submitted to the agency upon request for <br />review of possible cross -connection hazards for new or existing service connections. If it <br />is determined that a device is necessary to protect the public water system, the required <br />device must be installed before service will be provided or continued. <br />(2) The agency may conduct an on -premises inspection or reinspection to <br />evaluate cross -connection hazards. Any customer which cannot or will not allow an on - <br />premises inspection of their piping system shall be required to install the device the <br />agency considers necessary. <br />(h) User supervisor. At each premises where it is necessary in the opinion of <br />the agency, a user supervisor shall be designated by and at the expense of the customer. <br />This user supervisor shall be responsible for the monitoring of the devices and for <br />avoidance of cross -connections. In the event of contamination or pollution of the drinking <br />water system due to a cross -connection on the premises, the agency shall be promptly <br />notified by the user supervisor so that appropriate measures may be taken to overcome <br />the contamination. The customer shall inform the agency of the user supervisor's identity <br />on, as a minimum, an annual basis and whenever a change occurs. <br />(i) Type of protection required. <br />Ordinance No. NS -XXX <br />Page 25 of 56 <br />11 A-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.