My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75F
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
CORRESPONDENCE - 75F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 4:05:53 PM
Creation date
8/9/2017 4:19:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Clerk of the Council
Item #
75F
Date
7/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
847
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana City Council <br />20 Civic Center Plaza <br />Sanm Ana, California 92702 <br />RL•: One Broadway Plaza <br />Honorable Mayor and Council Members: <br />Els a resident of Santa Ana, I am very excited to hear about the proposed One Broadway <br />Plaza projes v This project is essential for the city in marry ways, Not only will One <br />Broadway Plaza be an Icon Landmark for the city, but also will provide economic <br />growth, which is despet=ly needed, for future succma of Santa Ana. One Broadway <br />Plaza will give the City of Santa Ana the recognition as a cultural hub for Orange <br />County. This project will change the outside perception of Santa Ana and will gain the <br />pride and respect as the Capitol City of Orange County, encouraging professional offices . <br />to relocate their headquarters to our downtown. <br />One Broadway Plaza's urban setting and location is ideal for the City of Santa Ana. So <br />many rimes, developers build on the outside edges of the city, which kills our downtown <br />areas. having a Class A oTacc building in the heart of Santa Ana win bring back life to <br />the Downtown/Midtown at=. I appreciate the attention the developer has given in <br />successfully weaving the historic past of Santa Ana with the future, providing urban <br />plazas and gathering areas for the residents. <br />I am -100% supportive of this pmject and encourage 100°c support, for the future success <br />of the city, from the council. Thank you for the opportunity to share my excitement for <br />One Broadway Plaza and the exciting growth ahead for the City of Santa Ana. <br />Sincerely, / <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.