My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS - 2002
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:32:30 AM
Creation date
8/10/2017 11:34:03 AM
Metadata
Fields
Template:
Contracts
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Project Environmental Impact Report Section 3.0 <br />At Seventeenth Street, an exclusive right turn lane would be required on the westbound approach to <br />achieve LOS D. This improvement would require additional widening on the north side of <br />Seventeenth Street east of Grand Avenue. This improvement has been included in the proposed <br />project. The additional properties for the right-of-way have been accounted for in the total parcels <br />affected by the proposed project. <br />Alternatives 1 and 2 will not result in adverse impacts related to on street parking and SCAG <br />transportation policies. No mitigation is required. <br />3.5.7 MITIGATION RELATED TO ACCESS <br />The following mitigation measures address the significant temporary adverse access impacts for <br />Alternatives 1 and 2 as discussed in Section 3.5.5 (Impacts Related To Access During <br />Construction). <br />T-1 Prior to initiating construction on the selected widening alternative for each construction <br />phase and segment of Grand Avenue, the City of Santa Ana will ensure that the project <br />contractor prepares traffic detour plans and construction truck access routes for that phase of <br />project construction. The plans will provide details to ensure access to existing <br />developments along the project roadway segments and provide traffic control in the project <br />area(s) during construction activities for each construction phase. The City of Santa Ana <br />will work with local businesses affected by the road widening project to ensure that the <br />businesses will be able to operate while road widening construction activities are underway. <br />The City of Santa Ana will review and approve the contractor's detour plans and truck <br />access routes. <br />T-2 Prior to commencing construction for individual segments of Grand Avenue, The City of <br />Santa Ana Public Works Agency and the project contractor will meet with representatives <br />from businesses on each project segment to identify individual business access needs <br />during construction. The defined access routes and entries to individual sites will be <br />clearly shown on all construction plans. <br />T-3 The City of Santa Ana will provide signs that indicate the project construction limits, access <br />routes, alternative routes, detour routes and entries to individual business sites for each <br />project segment and phase. <br />3.5.8 LEVEL OF SIGNIFICANCE AFTER MITIGATION RELATED TO <br />TRANSPORTATION AND ACCESS <br />The proposed widening of Grand Avenue under Alternatives 1 and 2 will largely result in beneficial <br />effects on traffic operations on the project segment of Grand Avenue. However, implementation of <br />either alternative will result in a significant avoidable adverse impact at the intersection of Grand <br />Avenue and Santa Ana Boulevard at the southbound right turn lane in the PM peak hour in 2020. <br />Alternatives 1 and 2 will not result in adverse impacts related to on street parking and SCAG <br />transportation policies. <br />F: TROJ-ENVAGrand eirWew Text - GrandlSection 3 Split&ction 3.5.doc Page 3.5-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.