Laserfiche WebLink
Grand Avenue Widening Project Environmental Impact Report Section 3.0 <br />TABLE 3.6-4 <br />DISTANCES TO EXISTING NOISE CONTOURS <br />Source: BridgeNet Consulting Services (July 2001). <br />Currently, there are 35 daily Metrolink trains operating on this track. There are also currently 25 <br />Amtrak trains which use the line each day. This line is also used for through and local freight <br />operations which are scheduled around the current passenger and commuter trains. This line <br />normally accommodates a couple through freight trains per day, and a local freight at least twice a <br />day. The local freights are generally less than ten cars in length while the through freights are often <br />6,000 feet in length. These through freight trains can be operated anytime of the day or night <br />depending on customer demand. <br />Analysis was conducted recently regarding the possible expansion of the existing rail line <br />through Santa Ana. The SCRRA prepared a Recirculated Draft E1R for the proposed Santa Ana <br />Second Main Track Project (Myra L. Frank and Associates and Frederic R. Harris, Inc., 2002). <br />That EIR indicated that if a second main line is constructed through the Cities of Santa Ana and <br />Orange, the total number of trains using this line could increase to 105 trains per day. <br />This operational data was used in conjunction with the Wyle Model to project existing train noise in <br />the Grand Avenue project area. These results are shown in Table 3.6-5 and are expressed as <br />distances from the railroad centerline to the 60, 65 and 70 dB contours. These projections are <br />unmitigated railroad noise effects which do not include consideration of topography or barriers such <br />as buildings or walls which would reduce these noise levels. The projected unmitigated noise level <br />at homes on the west side of Grand Avenue associated with operations on the SCRRA track is 60 <br />dB CNEL. Most of the east side of the railroad right of way, which is between the railroad track <br />and Grand Avenue, is developed in commercial and industrial uses. These buildings provide a <br />mitigating effect, reducing noise from railroad operations on land uses east of the tracks and these <br />developed uses by at least 10 dB. Therefore, at the distance the project segment of Grand Avenue is <br />from the railroad track and with consideration of the noise reduction effects based on distance and <br />intervening structures, the projected mitigated noise levels from railroad operations are expected to <br />be less than 50 dB CNEL and were determined to not significantly impact noise sensitive land uses <br />in the Grand Avenue project area. Therefore, the existing and future railroad operations on this <br />track were assumed not to contribute significantly to the noise environment in the Grand Avenue <br />area. <br />F: IPROJ-ENMGrand eirlNew Text - GrandlSection 3 Split0ection 3.6.doc Page 3.6-15 <br />Distance to CNEL Contours ft. <br />Roadway <br />ADT <br />70 dB <br />65 dB <br />60 dB <br />2001 <br />Grand Avenue <br />F40 <br />Seventeenth Street to Santa Ana <br />25,900 <br />46 <br />98 <br />212 <br />Boulevard <br />32,000 <br />43 <br />113 <br />244 <br />Santa Ana Boulevard to Fourth Street <br />30,300 <br />51 <br />109 <br />235 <br />Fourth Street to First Street <br />I-5 <br />Grand Avenue <br />1 236,000 <br />65 <br />461 <br />993 <br />2,138 <br />Source: BridgeNet Consulting Services (July 2001). <br />Currently, there are 35 daily Metrolink trains operating on this track. There are also currently 25 <br />Amtrak trains which use the line each day. This line is also used for through and local freight <br />operations which are scheduled around the current passenger and commuter trains. This line <br />normally accommodates a couple through freight trains per day, and a local freight at least twice a <br />day. The local freights are generally less than ten cars in length while the through freights are often <br />6,000 feet in length. These through freight trains can be operated anytime of the day or night <br />depending on customer demand. <br />Analysis was conducted recently regarding the possible expansion of the existing rail line <br />through Santa Ana. The SCRRA prepared a Recirculated Draft E1R for the proposed Santa Ana <br />Second Main Track Project (Myra L. Frank and Associates and Frederic R. Harris, Inc., 2002). <br />That EIR indicated that if a second main line is constructed through the Cities of Santa Ana and <br />Orange, the total number of trains using this line could increase to 105 trains per day. <br />This operational data was used in conjunction with the Wyle Model to project existing train noise in <br />the Grand Avenue project area. These results are shown in Table 3.6-5 and are expressed as <br />distances from the railroad centerline to the 60, 65 and 70 dB contours. These projections are <br />unmitigated railroad noise effects which do not include consideration of topography or barriers such <br />as buildings or walls which would reduce these noise levels. The projected unmitigated noise level <br />at homes on the west side of Grand Avenue associated with operations on the SCRRA track is 60 <br />dB CNEL. Most of the east side of the railroad right of way, which is between the railroad track <br />and Grand Avenue, is developed in commercial and industrial uses. These buildings provide a <br />mitigating effect, reducing noise from railroad operations on land uses east of the tracks and these <br />developed uses by at least 10 dB. Therefore, at the distance the project segment of Grand Avenue is <br />from the railroad track and with consideration of the noise reduction effects based on distance and <br />intervening structures, the projected mitigated noise levels from railroad operations are expected to <br />be less than 50 dB CNEL and were determined to not significantly impact noise sensitive land uses <br />in the Grand Avenue project area. Therefore, the existing and future railroad operations on this <br />track were assumed not to contribute significantly to the noise environment in the Grand Avenue <br />area. <br />F: IPROJ-ENMGrand eirlNew Text - GrandlSection 3 Split0ection 3.6.doc Page 3.6-15 <br />