My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - WATER DELIVERIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/15/2017
>
25I - AGMT - WATER DELIVERIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 6:44:08 PM
Creation date
8/10/2017 6:37:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
8/15/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adjustments have been made to Manned operations in Lines (C4), (C5), or (C6). In addition, <br />mark any box(es) below the Monthly In -Lieu Credit where Actuals to Date have been <br />determined <br />q Line C1 - Adjusted Baseline: This line carries forward Santa Ana's Adjusted Baseline <br />calculated in Line A6. <br />tai Line C2 - Actual Monthly Production Capability: Santa Ana specifies the actual well <br />capability available for the month being certified and, as needed, updates projected well <br />capability for the remainder of the operating period. <br />1Q Line C3 - Baseline: Spreadsheet calculates monthly Baseline, i.e., the lesser of the <br />Adjusted Baseline or Monthly Production Capability. <br />4 Line C4 - Groundwater Production: Santa Ana inputs amount of groundwater actually <br />produced during the operating period and, as needed, updates projected groundwater <br />production for the remainder of the operating period. <br />Line CS — All Other Local Sources: Santa Ana inputs local supplies actually produced <br />during the operating period and, as needed, updates local supplies projected for the <br />remainder of the operating period, <br />I Line Cb - Import: Santa Ana inputs imported water purchased from Metropolitan to <br />meet retail demand during the operating period and, as needed, updates imported water <br />projected for the remainder of the operating period. <br />Q Line C7 — Total Retail Demand; Spreadsheet calculates Santa Ana's retail demand, <br />i.e., Groundwater Production plus Other Local Sources plus Import. <br />1.:_A Line C8 - Monthly Underproduction: Spreadsheet calculates monthly groundwater <br />underproduction, i.e., Baseline less Groundwater Production. If positive, indicates water <br />being stored, If negative, indicates water being taken out of storage (overproduction), <br />Q Line C9 - Cumulative Underproduction: Spreadsheet sums monthly underproduction <br />through each month of the operating period beginning at the end of the operating period <br />(June). <br />r�'- Line CIO - Monthly In -lieu Credit: Spreadsheet calculates amount of monthly In -lieu <br />Treated Deliveries to be certified limited by Monthly Production Capability and Imported <br />water, <br />Worksheet 2 - Mont/fly Ceptification for Delivery of In -Lieu Cyclic Storage Wait,)- <br />Worksheet <br />aterWorksheet 2 must be submitted by Santa Ana for each month that it wishes to certify In -Lieu <br />Treated Deliveries. On each certification, Santa Ana must indicate their name, the identity of the <br />O.OPSEXECICONTIA NYPROORAM FORMSIREPLENISNMENT AND CUP CERTIFICATION DOCUMENTATION.000 <br />251-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.