Laserfiche WebLink
RPF #17-055 <br />Addendum No. Two <br />June 14, 2017 <br />14. Question: In Attachment 1 scope of work page 4 --15: is it within 2 working days or 5 <br />working days? It says both. <br />Response: Attachment 1: Scope of Work, Section B. SEWER MAIN TELEVISION INSPECTION, <br />No. 15 amended to read as follows: 15, In five (5) working days after being notified to <br />inspect a particular section of sewer main, the Contractor shall begin CCTV inspection, and <br />shall diligently pursue that work to completion. <br />15. Question: Which areas if any will require traffic control permits to be submitted? <br />Response: All traffic control shall conform to WATCH Handbook. <br />16. Question: Attachment 1 scope of work page 2., section B-2, states that start of inspection <br />will be in center of manhole, per NASSCO start of inspection is at mouth of Pipe? Please <br />confirm whether inspections will be per NASSCO-PACP? <br />Response: All contractors must follow NASSCO guidelines, with the exception that the start <br />of the inspection begins at the center of the manhole. <br />17. Question: Attachment 1 scope of work page 2, B-2: please clarify the intent of the "reverse <br />read out of camera distance"? <br />Response: Please reference Scope of Work Section B.2. The appropriate phrase for your <br />consideration, in its entirety, is: "forward and reverse readout of camera distance from <br />referenced access hole". In other words, the net distance traveled to the point of <br />observation; i.e. forward distance minus reverse distance yields the net distance traveled. <br />FOR THE CITY OF SANTA ANA <br />Rodolfo Rosas, P.E. <br />Senior Civil Engineer <br />z5j -169 <br />