Ckv: Santa Ana
<br />_
<br />Hou t o & thills AOS, Inc.
<br />21831 0 rton Rd.
<br />Grand Tenece, CA 92313
<br />xxx
<br />1'a1909 422-0990
<br />rF,v. 909422.0941
<br />E -moll.' f I I ou tanentlM1sms.cJm
<br />_
<br />Inspection Report
<br />Dale
<br />P/C. No,
<br />Weather
<br />Surveyors Name
<br />IWatorl D:
<br />Section No,
<br />8f26f2016
<br />dry
<br />Skylar
<br />6646
<br />1
<br />Certificate No.
<br />Survey cuBkomer
<br />System Center
<br />Deto Cleaned
<br />Pre -Cleaning
<br />Task Name:
<br />U314-06020850
<br />Houston
<br />& Harris PCS, In
<br />Santa Ana
<br />8I261201fi
<br />Jetting
<br />Task 062016
<br />Sheet Park
<br />Usa of Sewer Sanitary
<br />Upstream MH Cleanout
<br />City Santa Ana
<br />Drainage gran
<br />Dowstream MH NOB -026
<br />Loc. details
<br />Flow Conlrat Not Controlled
<br />Dir. of Survey Upstream
<br />Location Code
<br />Langth surveyed 326.94 it
<br />Section Length 326.94 it
<br />Purpose of Survey Maintenance Related
<br />Joint Length
<br />Year laid
<br />UladHeighl
<br />6 M11eh
<br />Year Rehabilitated
<br />Material
<br />Concrete Pipe (non -reinforced)
<br />Tape I Media No,
<br />Lining Method
<br />Add. Intonation;
<br />1:450
<br />Position
<br />Code
<br />Observation
<br />Grade
<br />0.00
<br />AMH
<br />Downstream Manhole, Survey Begins / N08-026
<br />08.02$
<br />0100
<br />MWL
<br />Water Level, 5 %of cross sectional area
<br />y�
<br />9.43
<br />TFC
<br />Tap Factory Made Capped, at 10 o'clock,
<br />within 8 inches of joint: YES, 4"
<br />11-79
<br />TFC
<br />Tap Factory Made Capped, at 02 o'clock,
<br />within 8 inches of joint: YES, 4"
<br />"
<br />re
<br />14.67
<br />FL
<br />Fracture Longitudinal, at 02 o'clock, within 8
<br />S3
<br />inches of joint: YES
<br />29.82
<br />B
<br />Broken, from 02 to 04 nbfoek, within 8Inehes of
<br />S5
<br />-�'
<br />joint: YES
<br />14.86 FT
<br />TFC
<br />Tap Factory Made Capped, at 10 o'clock, -,
<br />�r
<br />t54.28
<br />within 8 inches ofjoint YES, 4"
<br />�'=s
<br />{t{
<br />TFC
<br />Tap Factory Made Capped, at 02 o'clock, ,
<br />fh
<br />within 8 inches of joint: YES, 4"
<br />89.03
<br />TB
<br />Tap Break -In, at 10 o'clock, -, within 8 Inches of
<br />joint: YES 4"
<br />€96AN
<br />TFC
<br />'rap Factory Made Capped, at 10 o'clock, -,
<br />29,82 FT
<br />within 8 inches of joint: YES, 4"
<br />98.94
<br />TFC
<br />Tap Factory Made Capped, at 02 o'clock, •,
<br />..3:
<br />within 8 inches of joint: YES, 4"
<br />4
<br />TFC
<br />Tap Factory Mado Capped, at 10 o'clock,within
<br />C�1481..207
<br />8 Inches ofjoint: YES, 4"
<br />TFC
<br />Tap Factory Made Capped, of 02 o'clock, -,
<br />within 8 Inches of joint: YES, 4"
<br />219.01 FT
<br />•' 181.09
<br />TFC
<br />Tap Factory Made Capped, at 10 o'clock,-,
<br />t-'.
<br />within.8 Inches of Chi: YES, 4"
<br />183.64
<br />TFC
<br />Tap Factory Made Capped, at 02 o'clock,
<br />within 8 inches ofjoint YES, 4"
<br />288.43 FT
<br />Houston & Harris Sample Work It Page: 2
<br />2FgJ%J"`
<br />
|