My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - HIGHWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/15/2017
>
25M - AGMT - HIGHWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 6:47:52 PM
Creation date
8/10/2017 6:38:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/15/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C-7-XXXX <br />BETWEEN <br />ORANGE COUNTY TRANSPORTATION AUTHORITY <br />AND <br />CITY OF SANTA ANA <br />FOR <br />1-5 HOV IMPROVEMENT PROJECT <br />THIS COOPERATIVE AGREEMENT (Agreement), is effective this day of <br />20 _, by and between the Orange County Transportation Authority, 550 South <br />Main Street, P.O. Box 14184, Orange California 92863-1584, a public entity (herein referred to as <br />"AUTHORITY") and the City of Santa Ana, 20 Civic Center Plaza, Santa Ana, California 92701, a charter <br />city and municipal corporation duly organized and existing under the constitution and laws of the State of <br />California (herein referred to as "CITY'), each individually known as "Party" and collectively known as the <br />"Parties". <br />RECITALS: <br />WHEREAS, AUTHORITY, in cooperation and partnership with the California Department of <br />Transportation, herein referred to as "STATE", is proposing to reduce congestion and improve lane <br />continuity through the Interstate 5 (1-5) corridor with improvements to mainline on 1-5 between State <br />Route 55 (SR -55) and State Route 57 (SR -57). <br />WHEREAS, the improvements are generally defined as adding one High -Occupancy -Vehicle <br />(HOV) lane from SR -55 to SR -57, and other additional geometric improvements, including the removal <br />of the HOV Ramp at Main Street, all of which are hereinafter referred to as "PROJECT". AUTHORITY <br />will use a design -bid -build method of delivery for the procurement, design, and construction of <br />PROJECT and shall prepare contract documents (CONTRACT DOCUMENTS) to procure a design - <br />build team herein referred to as "CONTRACTOR"; and <br />Exhibit 2 <br />2511 21of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.