My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. - 2017
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:51:49 PM
Creation date
8/15/2017 9:58:39 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2017-154
Agency
PUBLIC WORKS
Council Approval Date
6/20/2017
Expiration Date
6/20/2020
Insurance Exp Date
10/1/2020
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well #32 Rehabilitation Engineering Services <br />useful in determining thin (weak) areas of the The Basis of Design will include, but not be limited <br />casing where corrosion may have removed a to, such issues as: <br />significant amount of metal, which could result <br />in the eventual formation of holes in the casing. T An overall evaluation of the existing Well station <br />based on current design standards. <br />We would be glad to meet with the City to discuss 2 <br />the advantages of removing the pump and the <br />additional data that can be obtained from these <br />tests. <br />Task Operational <br />Project Design Standard t. <br />Criteria <br />Tetra Tech will work with City staff to determine <br />the applicable design standards and criteria in <br />addition to those defined by the Study. We will <br />consider other possible agency design criteria and/ <br />or standards as necessary. A maximum of three <br />3-hour workshop sessions shall be conducted with <br />the Project Manager, City Operations staff and <br />the Tetra Tech design team. We will organize the <br />meeting including obtaining background information <br />for discussion, preparing the agenda, compiling <br />meeting minutes and action items, as well as <br />distributing the minutes as required. Elements to <br />be discussed shall include, but not be limited to, <br />operational parameters, ideal control conditions, <br />and operator experience. <br />Upon completion of Tasks 2 through 5 above, <br />Tetra Tech will prepare a Basis of Design Report <br />including elements and findings from all of the <br />Tasks. The Basis of Design Report shall summarize <br />all of the alternatives and outline the agreed upon <br />alternative including reasons why the alternative <br />was chosen. The Basis of Design Includes 30% <br />drawings of the chosen alternative including all <br />proposed improvements. The Basis of Design <br />Report shall be stamped and signed by a California <br />Registered Civil Engineer. Prior to completion of <br />the final Basis of Design Report, Tetra Tech will <br />prepare and submit for review a draft Basis of <br />Design Report to City staff. <br />Make recommendations for Well #32 <br />improvements including site alternatives (two <br />minimum) for the building as well as related <br />discharge piping. Propose possible building <br />architectural features that can be incorporated <br />into the local neighborhood surroundings and <br />provide concept drawings of the new building. <br />We have assumed we will consider two roof <br />type options — a gabled roof and a fiat -top roof <br />with a parapet. We have also assumed that <br />the building will be a CMU building, similar to <br />other City facilities. We will work with the City <br />and discuss building aesthetics and what can <br />be cost-effectively accomplished to better <br />assimilate the building into the park and the <br />surrounding residential area. We have assume <br />the preparation of two renderings, one for each <br />building type. <br />3. Identify new Well #32 station improvements <br />needed to improve operations, reliability, and <br />safety. The City would like to re -develop this <br />Well. Inform the City of the ideal method for <br />rehabilitation upon review of as-builts and well <br />survey video. In addition, the criteria as defined <br />in the Study shall be met, although additional <br />improvements related to the selected design <br />criteria may exist. Note: this well site is not <br />expected to have a permanent back-up power <br />system on -site. <br />4. Prepare preliminary electrical design plans for <br />the motor control center, Well #32 RTU control <br />panel, Garthe Pump Station RTU control panel <br />and related appurtenances. The City desires <br />that the existing motor control center (MCC) at <br />Garthe Pump Station remain in place and be <br />tied into the new RTU panel. <br />5. Make recommendations for communications <br />between Well #32 and Garthe Pump Station. <br />We will look at two alternatives for stable <br />communications between both sites: radio <br />
The URL can be used to link to this page
Your browser does not support the video tag.