My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-17 PC PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2017
>
06-12-17 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2017 9:50:58 AM
Creation date
8/16/2017 9:49:44 AM
Metadata
Fields
Template:
PBA
Doc Type
Agenda Packet
Date
6/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />PLANNING COMMISSION MINUTES 2 MAY 22, 2017 <br /> <br /> ABSTAIN: None (0) <br /> ABSENT: Alderete (1) <br /> <br /> <br />A. MINUTES FROM THE REGULAR MEETING OF MAY 8, 2017 <br /> <br />MOTION: Approve Minutes. <br /> <br /> <br />B. EXCUSED ABSENCES <br /> <br />MOTION: Excuse absent commission member(s): None. <br /> <br />* * * END OF CONSENT CALENDAR * * * <br /> <br /> <br />BUSINESS CALENDAR ITEMS <br /> <br />1. SITE PLAN REVIEW NO. 2017-02 <br />(Applicant: Tom Lo representing Charles Company) <br /> <br />Associate Planner Ni provided a presentation which included a project description, site <br />description and project analysis. Discussion ensued regarding location, security, building <br />height, design and materials. Kevin Tsai, Architect, answered questions regarding <br />security, parking and design. <br /> <br />Commissioner Bacerra motioned to approve the matter as recommended and then <br />rescinded the motion; expressed concerns regarding the proposed architecture and <br />finishes at the corner of Harbor Boulevard and Fifth Street and Fifth and Figueroa Streets. <br /> <br />Commissioner Mendoza motioned to approve the matter as recommended and it was <br />seconded by Commissioner Nguyen. <br /> <br />A substitute motion was introduced by Commissioner Contreras-Leo to refer the matter to <br />the Design Review Committee and it was seconded by Commissioner Bacerra. <br /> <br />Commissioner Nguyen rescinded his second on the original motion citing that the project <br />design needed be reviewed. <br /> <br />The original motion was then seconded by Vice Chair McLoughlin. <br /> <br />Chair Verino requested consideration for original motion. <br /> <br />A-2
The URL can be used to link to this page
Your browser does not support the video tag.