My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.-2017
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 4:08:23 PM
Creation date
8/24/2017 11:18:51 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2017-160
Agency
PUBLIC WORKS
Council Approval Date
7/5/2017
Expiration Date
7/4/2019
Insurance Exp Date
6/1/2019
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City does not guarantee the quantity of the wort: to be performed by the selected firm. Tile <br />consultant Shall be paid for the actual services provided for the,project according to the proposed <br />hourly rates and unit costs, <br />In addition to the FEE SCHEDULE, the ,proposer shall submit another fee proposal to include <br />construction surveying services that can be provided by the proposer but are not included in the <br />FEE SC(IEDULE'. This Fee proposal should be included in the aforementioned envelope. <br />Sltoetal �2ggttlremculs j�ttachntettt *19w <br />Cam a iafitrbe wltlt I2,�r„glljrehtenks of Filt�na,�genoy <br />Tliis agreement may be funded, In. part through Federal and Measure M2 funds , therefore <br />requiring compliance ,with all requirements of Caltrans'and' OCTA, Proposer shall comply with <br />all requiremeittsans lhey.'pert'ain to; the use of these funds; refer to.Appendix Attachment C <br />LAPM Exhibit 10-H: Sample CostProposal <br />• LAPM Exhibit 10-I :Notice to Proposors,'DBEInfcrmdtion <br />• LAPNPExhibit 10-101: Consultant Proposal DBE Commitment <br />LAPM`Exhlbit 10'-K: Consultant Certification of Contract Costs and,Financial <br />managcrttent System <br />IT SHALL BE'THE RESPONSPILITY OF THE CONSULTANT TO VERIFY THAT THE <br />LATEST VERSION' OF THESE DOCUMENTS IS USED IN THE PROPOSAL. LATEST <br />FORMS CAN' BE FOUND CA,LTANS, WEBSITE, CHAPTER 10: <br />wuww.dot,ea. ov%hotl.oett p o r n/ tCCH l"-htm <br />If the project will be financed, in part, by federal funds all services rendered shall meet all <br />required" federal -requirements included in this request for proposal. Consultants are advised that, <br />as required by federal law, the City of Santa Ana is implementing the now Race Conscious <br />Disadvarttagctl;Business Enterprise (DBE) Program The DBE goal for. this eontract.is ffl, <br />Consultants under contract with the City of Santa Ana will provide.support to City of Santa Ana <br />staff or their dc4Egnee on.an as-tioe(IJed basis, The. Consultants shall be thoroughly famillar.with <br />the Scope of Work prior toSuibmitting a response to this Request for Proposal (RFP). <br />• The Consultant shall perform work to produce a high quality,.,professional and complete <br />work product. <br />Consultant must have experience with State and. Federal funded projects. All, work shall <br />be performed in conformance with all applicable regulations, policies, procedures and <br />standards, <br />"The Consultant shall carry out the, instructions received from the Chyand shall cooperate <br />with the City and other agencies. <br />• The COlmatltant-Gas total responsibility for tlme accuracy -and completeness of the work <br />produced. The work will be reviewed by the City for conformity with the requilicments. <br />of the Agreement. Reviews by the City may NOT inelnde a detailed review For the <br />accuracy of iienis submitted. The responsibility for accuracy and completeness of such. <br />items renif.tins solely that of the Consultant. <br />City of Santa Ana RFP 17.009 <br />Paye A1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.