Laserfiche WebLink
IMONUMENT PERPETUATION <br />We cannot precisely determine a cost per monument. This due to variables of the site conditions. for instance, <br />monuments that are not on the surface need to be dug up -which can take 10-30 minutes - as compared to a <br />monument existing on the surface. <br />A monument that has 4 existing ties only requires us to verify the ties - tagging them if dtcy arc not currently <br />tagged. Conversely, a monument that has no existing ties will requires m to set lead ties with lead, tack and tag <br />which will need to then be measured. <br />Our firm has performed these types of projects in the past. We realize that when worldng with this many <br />monuments in widely varying conditions we will have wide variations in the existing conditions. The worst case <br />scenario is most of the monuments arc buried from previous paving projects and the existing ties are no longer <br />in place. <br />Considering all of these variables including filing of Corner Records we are comfortable with a per monument <br />unit cost which will allow us to complete any monument perpetuation project according to the scope outlined. <br />5550.00 per monument to be perpetuated. Once a specific project is issued we can provide a more accurate <br />rate to the City. <br />Construction Staking <br />2,000+/- Linear feet per day depending on site conditions. <br />52,475 for one day with aTwo-Vlan Crew <br />Mapchccldng <br />Survey Manager 5165.00/Hoar <br />1). Woolley K Associate.^., 111e. <br />3332 4Vatnut Avenue, Suite A Email; dwejE)jiir(si <br />9'uscin, Cnlifomia,92780 Phone: 714,71114.9461 <br />