My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T.I.'S BY DESIGN
Clerk
>
Contracts / Agreements
>
T
>
T.I.'S BY DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:19:32 PM
Creation date
8/29/2017 1:59:43 PM
Metadata
Fields
Template:
Contracts
Company Name
T.I.'S BY DESIGN
Contract #
A-2017-186
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
8/1/2017
Insurance Exp Date
12/1/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 11, 2017 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza M-11 <br />Santa Ana, CA 92701 <br />RE: PRELIMINARY BID <br />Police Station <br />60 Civic Center Plaza <br />STATEMENT OF WORK: <br />To perform replacement of existing domestic recirculation of hot water piping. We will gain access to equipment cat walk areas <br />through existing access panels and through newly installed access panels that we will install as needed. <br />We will schedule with Building Engineers for needed shut downs on water piping as needed for disconnect of old and reconnect of <br />new piping. <br />Piping systems will be in operation at the end of each day. All work to be performed during standard work hours. <br />Work will start 2-3 weeks after approval and 6-8 weeks for completion. <br />• Provide and install approx. 220' of 2" type '1" copper pipe on the 1" floor. <br />• Install (6) new ball valves at the appropriate locations. <br />• Provide and install approx. 240' of 1" type "L" copper pipe on the 3rd floor. <br />• Install (4) new ball valves at the appropriate locations. <br />• Insulate all the new hot water lines with Mansville fiberglass insulation. <br />• Includes all clean up and debris removal. <br />Total $ 81,600A0 <br />• Provide and install approx. 40'of 2" type "L" copper on 15` floor in boiler area. <br />• Provide and install (2) new ball valves in appropriate locations. <br />• Insulate all hot water piping with mansville fiberglass insulation. <br />Total $ 12,050.00 <br />• Install needed access panels. <br />Total $ 50,350.00 <br />Grand Total $144,000.00 <br />NOTE: Attached are specs for valve's and pipe mounts and copper pipes. <br />The cost includes prevailing wages <br />DIR # 1000038226 <br />3595 Cadillac Avenue, Suite 103 • Costa Mesa, California 92626 <br />(714)434-0596• Fax(714)434-9324 <br />License No. 8565438 <br />UIS <br />I <br />C <br />fnprovonleenl t Specialist <br />8 Building Renovailom <br />April 11, 2017 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza M-11 <br />Santa Ana, CA 92701 <br />RE: PRELIMINARY BID <br />Police Station <br />60 Civic Center Plaza <br />STATEMENT OF WORK: <br />To perform replacement of existing domestic recirculation of hot water piping. We will gain access to equipment cat walk areas <br />through existing access panels and through newly installed access panels that we will install as needed. <br />We will schedule with Building Engineers for needed shut downs on water piping as needed for disconnect of old and reconnect of <br />new piping. <br />Piping systems will be in operation at the end of each day. All work to be performed during standard work hours. <br />Work will start 2-3 weeks after approval and 6-8 weeks for completion. <br />• Provide and install approx. 220' of 2" type '1" copper pipe on the 1" floor. <br />• Install (6) new ball valves at the appropriate locations. <br />• Provide and install approx. 240' of 1" type "L" copper pipe on the 3rd floor. <br />• Install (4) new ball valves at the appropriate locations. <br />• Insulate all the new hot water lines with Mansville fiberglass insulation. <br />• Includes all clean up and debris removal. <br />Total $ 81,600A0 <br />• Provide and install approx. 40'of 2" type "L" copper on 15` floor in boiler area. <br />• Provide and install (2) new ball valves in appropriate locations. <br />• Insulate all hot water piping with mansville fiberglass insulation. <br />Total $ 12,050.00 <br />• Install needed access panels. <br />Total $ 50,350.00 <br />Grand Total $144,000.00 <br />NOTE: Attached are specs for valve's and pipe mounts and copper pipes. <br />The cost includes prevailing wages <br />DIR # 1000038226 <br />3595 Cadillac Avenue, Suite 103 • Costa Mesa, California 92626 <br />(714)434-0596• Fax(714)434-9324 <br />License No. 8565438 <br />
The URL can be used to link to this page
Your browser does not support the video tag.