Laserfiche WebLink
ATTACHMENT C <br />CITY OF SANTA ANA <br />CRAFT REQUEST FORM <br />TO THE CONTRACTOR: Please complete and fax this form to the applicable union to request craft workers that fulfill the <br />hiring requirements for this project. Atter faxing your request, please call the Local to verify receipt and substantiate their <br />capacity to famish workers as specified below. Please print your Fax Transmission Verification Reports and keep copies for your <br />records. <br />The City of Santa Ana Community Workforce Agreement establishes a goal that 30% of the total work hours shall be from <br />Veterans, regardless of where they reside, and workers residing: first, in those first tier zip codes which overlap all of the City of <br />Santa Ana, as attached hereto, second residing within Orange County, For Dispatch purposes, employees residing within either <br />of these two (2) areas, as well as Veterans, regardless of where they reside, shall be referred to as Local Residents. <br />TO THE UNION: Please complete the "Union Use Only" section on the next page and fax this form back to the requesting <br />Contractor. Be sure to retain a copy of this form for your records. <br />To: Union Local # <br />Cc: CWA Administrator <br />From: Company: <br />CONTRACTOR USE ONLY <br />Fax# <br />Issued By: <br />Contact Phone :( 1 Contact Fax: <br />Date: <br />PLEASE PROVIDE ME WITH THE FOLLOWING UNION CRAFT WORKERS. <br />Please have worker(s) report to the following work address indicated below: <br />Project Name: <br />Report to: _ <br />Comment or Special Instructions: <br />Site: <br />On-site Tel: <br />Address: <br />On-site Fax: <br />6/28/2016 Draft. PLA 39 City of Santa Ana <br />Local Resident, <br />Number <br />Craft Classification <br />Journeyman <br />Veteran <br />of <br />( i.e., plumber, painter, <br />or <br />or <br />workers Report Date Report Time <br />etc.) <br />Apprentice <br />General Dispatch <br />needed <br />TOTAL WORKERS REQUESTED = <br />Please have worker(s) report to the following work address indicated below: <br />Project Name: <br />Report to: _ <br />Comment or Special Instructions: <br />Site: <br />On-site Tel: <br />Address: <br />On-site Fax: <br />6/28/2016 Draft. PLA 39 City of Santa Ana <br />