My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - CONTRACT TO AMERICAN ASPHALT FAIRVIEW MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
20A - AA - CONTRACT TO AMERICAN ASPHALT FAIRVIEW MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:52:46 PM
Creation date
9/28/2017 5:39:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/3/2017
Destruction Year
2022
Document Relationships
ALL AMERICAN ASPHALT (16)
(Related to)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 3 <br />PROPOSAL <br />PROJECT NO.: 17-6881 <br />FAIRVIEW STREET PAVEMENT MAINTENANCE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />100 <br />CY <br />$ <br />33-00 <br />$ b 300 <br />2 <br />Rubberized Emulsion Aggregate Slurry <br />(REAS), Type 11 <br />1,100 <br />TN <br />$ `7-1.oo C. <br />5 <br />$ 63 yt10 <br />3 <br />Aspahlt Rubber Hot Mix (ARHM) * <br />3,200 <br />TN <br />$ <br />46.00 <br />$ <br />3ai,z0o <br />4 <br />Coldmill (2")* <br />244,900 <br />SF <br />S0, as <br />$ 61,zz5 <br />5 <br />Crack Sealing <br />1 <br />LS <br />$ 51 Soo <br />$ 57,300 <br />6 <br />Remove and Replace PCC Curb Ramp <br />11,200 <br />SF <br />$ 1 y $ S <br />$ 166 32 <br />1 <br />7 <br />Remove and Replace PCC Sidewalk * <br />1,500 <br />SF <br />$ lb -'i i <br />$ 16,110 <br />8 <br />Adjust Manhole Frame & Cover to <br />Finished Grade` <br />2 <br />EA <br />$ 115. o0 <br />$ I S s o <br />9 <br />Furnish and Install New Water Valve <br />Frame & Cover to Finished Grade <br />6 <br />EA <br />$ S17.00 <br />$ 5,262 <br />10 <br />Furnish and Install Pull Box #6 and Adjust <br />to Grade <br />2 <br />EA <br />$ 6oO <br />1 <br />$ 5 Z0 0 <br />1 I <br />Protection of Surface Utility Frames & <br />Covers <br />I <br />LS <br />$ <br />12 <br />Install Traffic Loop Type E t <br />60 <br />EA <br />$ a P� <br />$ 1610%o <br />13 <br />Install Traffic Loop Type D 'j <br />22PEA$ <br />a79,oU <br />$6113 t.14 <br />Temporary Construction Sign <br />4$ <br />1, ZU J <br />$ y' S+o <br />P -I ofP-16 <br />20A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.