Laserfiche WebLink
City of Santa Ana <br />Pavement Management System Update 2017/2018 <br />Cost Proposal <br />Task 1.4A Maintenance SVategies4 <br />8 <br />8 $ <br />3,200 <br />Task 1.48. Work History <br />4 <br />32 <br />$ <br />4,350 <br />Task 1AG Final Reports <br />4 <br />2 <br />8 <br />4 5 <br />2,500 <br />K <br />Task 3.1 Management and Administration <br />4 <br />6 <br />$ <br />1,400 <br />Task 3.2 Pavement Condition Surveys <br />2 <br />2 <br />8 56 <br />1 $ <br />6,900 <br />Assumptions: <br />Task 12 assumes walking surveys for approx. 105 centerline miles (994 MPAH sections). <br />Task 2.2 assumes walking surveys for approz_ 317 centerline miles (1,996 local sections). <br />Task 32 assumes walking surveys for approz 28 centerline ml les (280 alley sections). <br />All field surveys include 5% QC. <br />Task 1.4 Includes OCTA required reports and appendices. <br />Prepared by: Nichols Consulting Engineers, Chid. <br />25E-16 <br />September 2017 <br />