My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT ON-GOING CITY-WIDE CAMERA SYSTEM PROJECTS AND MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
25D - AGMT ON-GOING CITY-WIDE CAMERA SYSTEM PROJECTS AND MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 8:20:07 PM
Creation date
10/12/2017 8:12:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25D
Date
10/17/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />May 16, 2017 <br />City of Santa Ana <br />Santa Ana, California <br />Exhibit A - MSA with Siemens <br />and City of Santa Ana Michael nietsch <br />Enterprise Account Executive <br />Southern California <br />Project Name: Madison and Windsor Park Security Integration Program <br />• Park Security Enhancements <br />• Wireless Communications <br />• Code Blue Communications <br />• Security Camera Systems <br />• Talk -down Systems <br />• . Siemens to supply and install all equipment, per the enclosed materials schedules and work <br />descriptions: <br />o Cameras at parks <br />o City of Santa Ana Code Blue monuments at parks <br />o Wireless communications between City center buildings and parks <br />o Speakers at parks (one-way comm.) <br />o Storage and City IT network appliances <br />• Siemens to provide design and engineering for system issued for construction documentation. City of <br />Santa Ana to provide supporting infrastructure as-built.documentation in AutoCad format, for use by <br />Siemens. <br />• Siemens to provide all installation of devices, programming, commissioning and testing. Siemens to <br />provide a single training session for parks and recreation personnel (up to 4 persons, not to exceed 2 <br />hours). <br />• Project is limited to Windsor, Madison and City head -end systems (Police Department and City Hall). <br />Siemens assumes City IT to support project with network configuration and programming. <br />• Project is an extension to City owned security network platforms. Video archiving shall be for 365 <br />days and integrate with SAPD Milestone XProtect system and Code Blue communications program. <br />SAPD/City Ball Head -end: <br />1. One (1) Management Server <br />2. One (1) Network Storage Server (1 10T13 Raw) <br />3. Audio Management Software (one-way comm. software) <br />4. Fiber, Copper cablings and interconnects <br />5. Installation of servers, coordination with Santa Ana IT and programming <br />Madison Park: <br />1. Siemens to provide and install one (1) PTZ on pole by baseball field. Pole shall be used for wireless <br />radio mounting (line of sight to City Hall). <br />2. Siemens to provide and install two (2) one-way comm, speakers on pole. <br />SOW Page I 1 <br />25D-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.