Laserfiche WebLink
wage decision <br />(4) Pneumatic Nailer, <br />Power Stapler ...............$ 40.09 15.50 <br />(5) sawfiler...............$ 39.83 15.50 <br />MScaffold Builder ....... $ 31.60 15.50 <br />Table Power saw <br />Operator ....................$ 40.93 15.50 <br />FOOTNOTE: work of forming in the construction of open cut <br />sewers or storm drains, on operations in which horizontal <br />lagging is used in conjunction with steel H -Beams driven or <br />placed in pre- drilled holes, for that portion of a lagged <br />trench against which concrete is poured, namely, as a <br />substitute for back forms (which work is performed by <br />piledrivers): $0.13 per hour additional. <br />---------------------------------------------------------------- <br />CARP0409-005 07/01/2015 <br />Rates Fringes <br />Drywall <br />DRYWALL INSTALLER/LATHER .... $ 40.40 15.03 <br />STOCKER/SCRAPPER ............ $ 10.00 7.17 <br />---------------------------------------------------------------- <br />CARP0409-008 09/01/2010 <br />Rates Fringes <br />Modular Furniture installer ...... $ 17.00 7.41 <br />---------------------------------------------------------------- <br />ELECO011-002 07/31/2017 <br />COMMUNICATIONS AND SYSTEMS WORK <br />Rates Fringes <br />Communications System <br />installer ...................$ 30.73 14.00 <br />Technician ..................$ 32.18 3Y+27.32 <br />SCOPE OF WORK: <br />Installation, testing, service and maintenance of systems <br />utilizing the transmission and/or transference of voice, <br />sound, vision and digital for commercial, educational, <br />security and entertainment purposes for the following:.Tv <br />monitoring and surveillance, background -foreground music, <br />intercom and telephone interconnect, inventory control <br />systems, microwave transmission, multi -media, multiplex, <br />nurse call systems, radio page, school intercom and sound, <br />burglar alarms, fire alarm (see last paragraph below) and <br />low voltage master clock systems in commercial buildings. <br />Communication systems that transmit or receive information <br />and/or control systems that are intrinsic to the above <br />listed systems; inclusion or exclusion of terminations and <br />testings of conductors determined by their function; <br />excluding all other data systems or multiple systems which <br />include control function or power supply; excluding <br />installation of raceway systems, conduit systems, line <br />voltage work, and energy management systems. Does not <br />cover work performed at China Lake Naval Ordnance Test <br />Station. Fire alarm work shall be performed at the current <br />inside wireman total cost package. <br />Page 3 <br />25D-37 <br />