Laserfiche WebLink
wage decision <br />FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a <br />Bosn'n's chair or suspended from a rope or cable shall <br />receive 40 cents per hour above the foregoing applicable <br />Classification rates. workers doing gunite and/or <br />shotcrete work in a tunnel shall receive 35 cents per hour <br />above the foregoing applicable classification rates, paid <br />on a portal-to-portal basis. Any work performed on, in or <br />above any smoke stack, silo, storage elevator or similar <br />type of structure, when such structure is in excess of <br />75'-0" above base level and which work must be performed in <br />whole or in part more than 75'-0" above base level, that <br />work performed above the 75'-0" level shall be compensated <br />for at 35 cents per hour above the applicable <br />classification wage rate. <br />GUNITE LABORER CLASSIFICATIONS <br />GROUP 1: Rodmen, Nozzlemen <br />GROUP 2: Gunmen <br />GROUP 3: Reboundmen <br />------------------------- <br />LAB00652-001 07/03/2017 <br />LABORER (TUNNEL) <br />Rates Fringes <br />GROUP <br />1 .....................$ <br />39.04 <br />18.24 <br />GROUP <br />2 .....................$ <br />39.36 <br />18.24 <br />GROUP <br />3 .....................$ <br />39.82 <br />18.24 <br />GROUP <br />4 .....................$ <br />40.51 <br />18.24 <br />LABORER <br />GROUP <br />1 .....................$ <br />33.19 <br />18.24 <br />GROUP <br />2 .....................$ <br />33.74 <br />18.24 <br />GROUP <br />3 .....................$ <br />34.29 <br />18.24 <br />GROUP <br />4 .....................$ <br />35.84 <br />18.24 <br />GROUP <br />5 .....................$ <br />36.19 <br />18.24 <br />LABORER CLASSIFICATIONS <br />GROUP 1: cleaning and handling of panel forms; concrete <br />screeding for rough strike -off; concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean-up; Laborer, landscaping; Laborer, jetting; Laborer, <br />temporary water and air lines; Material hose operator <br />(walls, slabs, floors and decks); Plugging, filling of shee <br />bolt holes; Dry packing of concrete; Railroad maintenance, <br />repair track person and road beds; streetcar and railroad <br />construction track laborers; Rigging and signaling; scaler; <br />slip form raiser; Tar and mortar; Tool crib or tool house <br />laborer; Traffic control by any method; window cleaner; <br />wire mesh pulling - all concrete pouring operations <br />GROUP 2: Asphalt shoveler; cement dumper (on 1 yd. or larger <br />mixer and handling bulk cement); cesspool digger and <br />installer; chucktender; Chute handler, pouring concrete, <br />Page 16 <br />25D-50 <br />