My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT ON-GOING CITY-WIDE CAMERA SYSTEM PROJECTS AND MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
25D - AGMT ON-GOING CITY-WIDE CAMERA SYSTEM PROJECTS AND MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 8:20:07 PM
Creation date
10/12/2017 8:12:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25D
Date
10/17/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wage decision <br />removal of all traffic lines and markings by any method <br />(sandblasting, waterblasting, grinding, etc.) and <br />preparation of surface for coatings. Traffic control <br />person: controlling and directing traffic through both <br />conventional and moving lane closures; operation of all <br />related machinery and equipment <br />GROUP 3: Traffic delineating device applicator: Layout and <br />application of pavement markers, delineating signs, rumble <br />and traffic bars, adhesives, guide markers, other traffic <br />delineating devices including traffic control. This <br />category includes all traffic related surface preparation <br />(sandblasting, waterblasting, grinding) as part of the <br />application process. Traffic protective delineating system <br />installer: removes, relocates, installs, permanently <br />affixed roadside and parking delineation barricades, <br />fencing, cable anchor, guard rail, reference signs, <br />monument markers; operation of all related machinery and <br />equipment; power broom sweeper <br />GROUP 4: striper: layout and application of traffic stripes <br />and markings; hot thermo plastic; tape traffic stripes and <br />markings, including traffic control; operation of all <br />related machinery and equipment <br />LABO1414-001 08/02/2017 <br />25D-53 <br />Rates <br />Fringes <br />LABORER <br />PLASTER CLEAN-UP LABORER .... <br />$ 32.50 <br />18.29 <br />PLASTER TENDER ..............$ <br />35.05 <br />18.29 <br />work on a swing stage scaffold; <br />$1.00 per hour <br />additional. <br />----------------------------------------------------------- <br />PAIN0036-001 07/01/2017 <br />Rates <br />Fringes <br />Painters: (Including Lead <br />Abatement) <br />(1) Repaint (excludes San <br />Diego county) ...............$ <br />27.59 <br />13.94 <br />(2) All other work .......... <br />$ 31.12 <br />13.94 <br />REPAINT of any previously painted <br />structure. <br />Exceptions: <br />work involving the aerospace <br />industry, breweries, <br />commercial recreational facilities, <br />hotels which <br />operate <br />commercial establishments as <br />part of hotel service, and <br />sports facilities. <br />----------------------------------------------------------- <br />PAIN0036-008 10/01/2016 <br />Rates <br />Fringes <br />DRYWALL FINISHER/TAPER ........... $ 37.18 <br />17.99 <br />----------------------------------------------------------- <br />PAIN0036-015 06/01/2017 <br />Rates <br />Fringes <br />Page 19 <br />25D-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.