My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 9:07:42 AM
Creation date
10/16/2017 9:06:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Personnel Services
Item #
20A
Date
10/17/2017
Destruction Year
2022
Document Relationships
ARNAZ ENGINEERING CONTRACTORS, INC. (3)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 17, 2017 <br />TITLE: <br />APPROVE APPROPRIATION <br />ADJUSTMENTS AND AWARD CONTRACT <br />TO ARNAZ ENGINEERING <br />CONTRACTORS, INC. FOR EMERGENCY <br />REPAIRS RELATED TO JANUARY 2017 <br />STORM DAMAGE <br />(PROJECT 17-6613) <br />(STRATEGIC PLAN NO. 6, 1C) <br />-CITYPANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 151 Reading <br />❑ Ordinance on 2ntl Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Authorize the City Manager and Clerk of the Council to award and execute a construction <br />contract to Arnaz Engineering Contractors, Inc., for emergency construction to repair storm <br />damage at the Lincoln Avenue Channel, to be performed on a time -and -materials basis, in the <br />total amount not to exceed $431,250, subject to nonsubstantive changes approved by the City <br />Manager and the City Attorney. <br />Approve the Project Cost Analysis for a total estimated construction delivery cost of $540,000, <br />which includes the contract amount, administration, inspection, testing, and an authorized <br />contingency of $44,025. <br />Approve an appropriation adjustment appropriating $460,000 from prior year fund balance in <br />the Local Drainage Area II revenue account, and appropriating the same amount into the <br />Local Drainage Area II expenditure account. <br />4. Approve an appropriation adjustment appropriating $80,000 from prior year fund balance in <br />the Local Drainage Area V revenue account, and appropriating the same amount into the <br />Local Drainage Area V expenditure account. <br />DISCUSSION <br />Between January 18 and January 23, 2017, the City of Santa Ana, along with many other <br />communities throughout California, experienced a period of heavy rainfall and flooding when a <br />significant system of rainstorms passed over the state. In the course of these storms, the City <br />suffered several emergency events, including damage to two stormwater drainage facilities and <br />several fallen street trees. Along the Lincoln Avenue Channel (located within Local Drainage <br />20A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.