My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 9:07:42 AM
Creation date
10/16/2017 9:06:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Personnel Services
Item #
20A
Date
10/17/2017
Destruction Year
2022
Document Relationships
ARNAZ ENGINEERING CONTRACTORS, INC. (3)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 17-6613 <br />EMERGENCY CONSTRUCTION <br />EXHIBIT A <br />PROPOSAL <br />SCOPE OF SERVICES AND COMPENSATION SCHEDULE SHALL BE BASED ON A <br />TIME AND MATERIAL FORCE ACCOUNT BASIS AS SPECIFIED IN THE STANDARD <br />SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. <br />The urgent repairs shall be completed by performing the work on a design -build basis limited to <br />time and material pricing, using acceptable methods and equipment approved by the City. Costs <br />shall be calculated based on actual costs and quantities of materials used by the contractor at <br />standard materials pricing, and actual man-hours worked at standard prevailing wage rates. Staff <br />shall verify and confirm accounting of materials and labor consumed to monitor progress and <br />billing. <br />THE WORK SHALL TAKE PLACE AT THE FOLLOWING LOCATIONS: <br />1) Emergency Protective Measures at Lincoln Avenue Channel includes concrete debris removal, temporary <br />shoring installation, removal, and rental fees. The cost is not expected to exceed $60,000. <br />2) Emergency Construction at Lincoln Avenue Channel includes demolition and reconstruction of channel and <br />wall. The cost is not expected to exceed $371,250. <br />20A-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.