My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 9:07:42 AM
Creation date
10/16/2017 9:06:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Personnel Services
Item #
20A
Date
10/17/2017
Destruction Year
2022
Document Relationships
ARNAZ ENGINEERING CONTRACTORS, INC. (3)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 17-6613 <br />EMERGENCY CONSTRUCTION <br />This CONSTRUCTION CONTRACT is made and entered into this 17th day of October, 2017 by and <br />between the City of Santa Ana, California, a charter city and municipal corporation organized and <br />existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Amaz <br />Engineering Contractors, hie. (hereinafter "CONTRACTOR'). <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: <br />1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and <br />expense necessary to construct and complete in a good and workmanlike manner and to the <br />satisfaction of the City Engineer of the CITY, the Emergency Repairs Related to January 2017 <br />Storm Damage Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in <br />and in accordance with the Contract Documents prepared by the City's Public Works Agency and <br />approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents" as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Technical Provisions and Project Plans <br />• Community Workforce Agreement <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK <br />OF hVIPROVEMENT the sum total amount not to exceed Four Hundred Thirty -One Thousand Two <br />Hundred Fifty Dollars ($431,250), as set forth and identified in the BID PROPOSAL, which is <br />attached hereto and incorporated herein as Exhibit "A." <br />The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate <br />quantities only, and the City does not expressly or by implication agree that the actual amount of <br />work will correspond therewith, but reserves the right to increase or decrease the amount of any <br />class or portion of the work or to omit portions of the work as may be deemed necessary or <br />advisable. <br />rev. 09/01/2017 20A-7 _7 Page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.