Laserfiche WebLink
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />FAIRVIEW STREET DESIGN SERVICES <br />FROM 9TH ST. TO 16TH ST. INCLUDING BRIDGE REPLACEMENT <br />RFP NO. 17-074 <br />GENERAL INTRODUCTION <br />The City of Santa Ana is soliciting proposals from qualified firms to provide the following <br />services, as necessary but not limited to: <br />• Project Coordination <br />• Record Research <br />• Topographic Survey <br />• Water Quality Requirements <br />• Environmental Clearance Documents and Reports; Permit Compliance <br />• Hydrology/Hydraulic Analyses and Modeling <br />• Geotechnical studies/reports/boring <br />• Prepare Highway Bridge Program (HBP) E-76 Application for Construction <br />• Street and Bridge Design <br />• Traffic Signage and Striping <br />• Landscaping and Irrigation <br />• Final Plans, Specifications, and Estimates (PS&E) <br />• Bid and Construction Support <br />INTRODUCTION / PROJECT DESCRIPTION <br />The City of Santa Ana (City) desires to enter into an Agreement with a qualified professional <br />engineering consulting firm for the preparation of environmental documents design of street <br />widening, bridge replacement, and environmental documents and regulatory permits for Fairview <br />Street Bridge crossing over Santa Ana River. This contract will also include providing limited <br />field observation and construction support. <br />Within the City, Fairview Street is classified as a north -south Major Arterial per the City's <br />General Plan Circulation Element (GPCE) and the County of Orange's Master Plan of Arterial <br />Highway (MPAH). The City is proposing to widen Fairview Street between 9th Street and 16Th <br />Street from a four -lane roadway to a 6 -lane arterial to provide adequate vehicular capacity within <br />the City's northern limits. A segment of the project limit includes a bridge replacement. <br />The Fairview Bridge is funded through the HBP for bridge replacement. Currently, Fairview <br />Bridge is striped with two lanes in each direction with no curb or sidewalk. Therefore, bridge <br />replacement is necessary to accommodate 3 lanes in each direction and to provide a complete <br />bridge deck with barrier rail, sidewalk, raised median, and lighting for a total bridge width of <br />100' wide. See Attachment 5 for Bridge inspection report, Major Structure Data, and Project <br />alignment limit. <br />City of Santa Ana RFP 17-074 <br />Page Al -1 <br />