2) Independent Structural Check, Bridge: Prepare and furnish to CITY two <br />copies of the independent check performed for the bridge using standard three <br />ring binders. All bridge independent calculations shall be checked/confirmed, <br />signed, and stamped by a Registered Civil Engineer(s) and/or Registered <br />Structural Engineer(s) who is duly licensed by the State of California. and not <br />involved with the original design. The independent checker shall reanalyze <br />the structure and complete the following: <br />a) Review relevant background and supporting information; <br />b) Verify member capacities; <br />c) Review plans for completeness and consistency with the design; <br />d) Resolve design issues with the designer - final design will reflect <br />Agreement between the designer and checker; <br />e) Check the corrected plans for conformance with prior comments; <br />f) Review the PROJECT special provisions to ensure all bridge items, <br />and associated items of work are adequately addressed, and <br />g) Prepare independent Quantity calculations. <br />c) 100% PS&E <br />1) The Consultant shall submit the following documents for review and <br />approval: <br />Four sets (4) full size (24"x36") signed and sealed prints of checked design <br />Electronic copies of Special Provisions <br />One (1) copy of edited Structure Special Provisions on a computer disk <br />Electronic copies of cost estimate and check quantity calculations <br />Electronic copies of design calculations <br />Electronic copies of design check calculations <br />Electronic copies of final Foundation Report <br />Other reports as needed by the City of Santa Ana <br />2) The City will review and comment on the PS&E package as soon as possible. <br />The turnaround goal is within four (4) weeks of receipt of the complete PS&E <br />package. One (1) copy of those documents with comments will be returned to <br />the Consultant. <br />d) FinalPS&E <br />The Consultant shall submit the following documents for review and approval: <br />Electronic sets of signed final design plans <br />Electronic copies of signed final specifications <br />Electronic copies of final cost estimate and final quantity calculations <br />Electronic copies of final design calculations <br />Electronic copies of final design check calculations <br />Electronic files in its original format and in PDF of all plans, specifications, and <br />estimates <br />City of Santa Ana RFP 17-074 <br />Page Al -5 <br />