Laserfiche WebLink
Task 7: Wafer Quality <br />Proposal for <br />Santa Ana Main Street <br />Corridor Improvements <br />Kimley-Horn will develop a Water Quality Management Plan (WQMP) for the project in compliance <br />with, and meeting the requirements of Order No. R8-2009-0030/NPDES No. CAS618030, of the Santa <br />Ana Regional Water Quality Control Board. The WQMP will incorporate Low Impact Development (LID) <br />Best Management Practices (BMP) to the Maximum Extent Practical (MEP). For example, the use of <br />bioretention facilities within landscaped parkway areas will be in accordance with the USEPA Green Street <br />standards. If traditional LID BMPs cannot be incorporated, appropriate proprietary BMPs will be selected to <br />improve water quality. If proprietary items are needed, these will be indicated in compliance with the City's <br />adopted public contracting code. <br />Deliverables: Draft Water Quality Management Plan, Final Water Quality Management Plan <br />Task 8: Design Development Plans <br />The project team will refine the fixed elements of the approved Vision Plan and develop a more detailed <br />approach to the street closures, crosswalks, sidewalks, street furnishings, bulb -outs, parklets and lighting <br />to check their compatibility with the existing conditions and technical analysis of previous tasks. <br />The first phase of the cultural trail, establishing a visual language for the entire trail, will also be part of <br />this work. The development of the plazas/parklets at the proposed vacated streets will be vetted during <br />this phase to ensure their compliance with traffic, fire access, and neighborhood agreement. Two review <br />sessions with the City staff of the design development package will be included in this task. Design <br />revisions will be limited to two rounds. <br />The goal of this task is to maintain the Vision while revising elements as required in this more detailed <br />phase of work. A cost estimate will be undertaken at the conclusion of this phase to ascertain the final <br />elements to be developed during the next phases of work. <br />Deliverables: Design Development Plans <br />Cask 9: <br />Kimley-Horn will develop a street improvement <br />plan for the construction of new bulb -outs, <br />ADA improvements, and roadway pavement <br />improvements for the implementation of these <br />a; features as shown in the RFP Exhibits. The plans <br />will show horizontal and vertical design information. <br />j Roadway plans will be prepared at a scale of 1" _ <br />20' horizontal and V = 2' vertical for profiles. We <br />j will use the field surveys obtained in Task 2 for base <br />.�,� „ mapping. Vertical design information for construction <br />of new bulb -outs, and non-standard curb ramps will <br />be indicated on the plans with elevation callouts. Curb and flow line profiles will be shown if determined <br />reasonably necessary. Details and typical sections will be added as indicated in the drawing list provided <br />with our fee. Necessary adjustments to surface utility features will be identified and addressed with call <br />outs and construction notes. We will prepare details for items that deviate from published standards. Plan <br />preparation will be coordinated with the City, and other agencies such as Orange County Fire Authority, <br />Community Development Agency, OCTA, and utility companies. We assumed design for bulb -outs will be <br />Kimsey )))Horn 14 TRRD77004.17 I City of Santa Ana <br />