My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF-2017
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2017 12:32:07 PM
Creation date
10/27/2017 12:28:04 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A--2017-259
Agency
Public Works
Council Approval Date
10/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Change orders for work within Garden Grove must receive the written approval of the Public <br />Works Department Engineering Manager of Garden Grove or his/her designee prior to <br />implementation. <br />7. The following staff members, or as otherwise designated in writing by the Executive Director of <br />Public Works of Santa Ana or the Public Works Department Engineering Manager of Garden <br />Grove, shall be the selected representatives of each City to act on each respective City's behalf <br />with respect to this agreement. Any notices, requests, approvals, plan submittals or <br />communications shall be provided to each representative noted below: <br />City of Santa Ana: <br />ATTN: Edwin "William" Galvez, <br />City Engineer <br />Public Works Agency <br />Santa Ana, CA 92701 <br />20 Civic Center Plaza, M-21 <br />Phone: (714) 647-5653 <br />E -Mail: wgalvez@santa-ana.org <br />City of Garden Grove: <br />P. E. ATTN: Dan Candelaria, P.E., T.E. <br />City Engineer <br />Public Works Department <br />11222 Acacia Parkway <br />Garden Grove, CA 92840 <br />Phone: (714) 741-5192 <br />E -Mail: dant@ci.garden-grove.ca.us <br />8. Santa Ana shall cause its contractor for the Project to guarantee the Garden Grove <br />improvements against defects in workmanship and materials for a period of one (1) year from the <br />date of acceptance by Santa Ana. It is further agreed that Santa Ana shall assume the <br />responsibility for causing the Garden Grove improvements to be brought or restored to full <br />compliance with the requirements of the Plans and Specifications for any portion of the Project <br />which during said one (1) year period are found not to be in conformance with the provisions of <br />the Plans and Specifications. <br />9. The City of Santa Ana shall have its contractor provide insurance as follows: <br />9.1 INSURANCE AMOUNTS. Contractor shall maintain the following insurance for the <br />duration of this Agreement: <br />(a) Commercial general liability in the amount of $1,000,000 per occurrence; (claims <br />made and modified occurrence policies are not acceptable); Insurance <br />companies must be acceptable to City and have an AM Best's Guide Rating of A - <br />Class VII or better, as approved by the City. If Contractor maintains broader <br />coverage and/or higher limits than the minimums shown above, the City shall be <br />entitled to the broader coverage and/or higher limits maintained by the Contractor. <br />Any available insurance proceeds in excess of the specified minimum limits of <br />insurance and coverage shall be available to the City. <br />An Additional Insured Endorsement, ongoing and completed operations, for the <br />policy shall designate the City of Santa Ana, the City of Garden Grove, their officers, <br />officials, employees, agents, and volunteers as additional insureds for liability arising out <br />of work or operations performed by or on behalf of the Contractor. Contractor shall provide <br />to City proof of insurance and endorsement forms that conform to City's requirements, as <br />approved by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.