Laserfiche WebLink
CITY OF SANTA ANA Project No.: 17-6881 <br />By: Mindy Ly Date Revised: 08/24/17 <br />COST ESTIMATE (CITY OF GARDEN GROVE JURISDICTION) <br />FAIRVIEW STREET PREVENTATIVE MAINTENANCE <br />FROM 200'N/0 EDNA DRIVE TO SR -22 OFF RAMP <br />NO,- <br />AGItiPTL011 <br />QUANTY TI <br />1 <br />Unclassified Excavation <br />30 <br />$ <br />33.00 <br />$ <br />990.00 <br />2 <br />REAS T e 2 <br />dTN <br />45 <br />$ <br />577.00 <br />$ <br />25,965.00 <br />3 <br />As halt Rubber Hot Mix (ARHM)* <br />60 <br />$ <br />96.00 <br />$ <br />5,760.00 <br />4 <br />Cold Mill (2")* <br />0 <br />$ <br />0.25 <br />$ <br />5 <br />lCrack Sealing <br />LS 1 <br />0.030 <br />$ <br />57,300.00 <br />$ <br />1,708.00 <br />6 <br />1PCC Curb Ram Avalon Ave & Downie) <br />SF <br />900 <br />$ <br />14.85 <br />$ <br />13,365.00 <br />7 <br />Remove and Replace PCC Sidewalk* <br />SF <br />0 <br />$ <br />10.74 <br />$ <br />8 <br />Adjust Manhole Frame & Cover to Finished Grade <br />EA <br />0 <br />$ <br />775.00 <br />$ <br />9 <br />Fumish/fi stall Now Wv Frame & Cover to Finished Grade <br />EA <br />0 <br />$ <br />877.00 <br />$ <br />10 <br />Fumish/histall new PB #'6 Frame/Cover & Adjust to Grade <br />EA <br />0 <br />$ <br />2,600.00 <br />$ <br />1.1 <br />Protection of Surface Utility Frames and Covers <br />LS <br />0 <br />$ <br />1,032.00 <br />$ <br />12 <br />Traffic Loops Type E <br />EA <br />0 <br />$ <br />268.00 <br />$ <br />13 <br />Traffic Loops Type D <br />EA <br />0 <br />$ <br />279A0 <br />$ <br />14 <br />Temporary Construction Sign <br />EA <br />0 <br />$ <br />1,200.00. <br />$ <br />15 <br />Striping including sandblasting of exist.) <br />LS <br />0.030 <br />$ <br />99,300.00 <br />$ <br />2,961,00 <br />', TOTALCONt�T,I;.UC'�LQN G,O',ST I' <br />;� $. <br />50,749:00 f <br />Design Engineering <br />$ <br />Contingency <br />$ <br />5,000.00 <br />Construction Engineering <br />jlEs <br />$ <br />8,000.00 <br />7'O'I;IS.i'.,PIibC�,'[T,',. <br />_,$ <br />_ 63,700.Ob'. <br />Note: A. Assume no work inose.- the westerly shoulder between Giendon and SR -22 o£r-ramp (severe pavement deterioration) <br />Note: 2. Found 2-NiaJor aligator cracks to front of 13072 Fairview NIB; 2 -malar cracks in front of SR -22 off -ramp S/B, and major cracks <br />in lane #2 in front of 131 It Fairview SIB <br />K:1Deslgn\_ProfnctsNcliveV\tlerial ImprovemenlsV%rlerial Street Slurry Seal (17-6881)\Documonts\cstimates\Fairview from Segerstmm to NCL Estimate for Garden Grove Juriadicaoi <br />-Ravi 20170802\Garden Grave Cost 812,512017 <br />