Laserfiche WebLink
i. All application documents required in the City's Phase 1 Registration <br />Application package. <br />H. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Business Owner(s)/Applicant(s) referenced on the application provides <br />a Live Scan that was conducted within 14 days prior to submitting the <br />application. <br />V. Phase 1 application fee is paid. <br />vi. A signed statement that the proposed location of the commercial <br />cannabis business on the application meets the zoning criteria <br />established in this article including, but not limited to, any and all <br />sensitive use separation criteria required by this article. <br />d. The Director of Planning and Building or designee(s) shall determine whether <br />each application demonstrates compliance with the minimum requirements <br />(above) and be placed on the RSP Eligibility List and entered into the Phase 2 <br />application and review process. <br />e. The Director of Planning and Building or designee(s) shall review each <br />application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be <br />notified in writing of the deficiencies. The applicant shall be given an opportunity <br />to cure any incomplete or deficient application prior to the conclusion of the <br />application processing term, if such time period is applicable. <br />3. Phase 2 - Regulatory Safety Permit Application <br />a. Each applicant identified on the RSP Eligibility List may choose to complete and <br />file a RSP application to the Director of Planning and Building. The application <br />shall be filed together with a nonrefundable fee as established by resolution of <br />the City Council, to defray the cost of investigation required by this article. <br />b. The RSP application period shall be open for thirty (30) calendar days and may <br />run concurrently with the Phase 1 review period. Following the RSP application <br />period, the Director of Planning and Building or designee(s) shall stop accepting <br />applications and review all applications received in Phase 2. <br />c. The Director of Planning and Building or designee(s) will review all application <br />documents required in the City's Phase 2 application package plus the additional <br />requirements in subsection (d) below. The Director of Planning and Building or <br />designee(s) will use a merit based point system to review and rank each of <br />Ordinance No. NS -XXX <br />Page 22 of 28 <br />75E-2-56 <br />