My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT AND THE MUNICIPAL WATER DISTRICT OF ORANGE COUNTY (2) - 2017
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT AND THE MUNICIPAL WATER DISTRICT OF ORANGE COUNTY (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2017 8:36:43 AM
Creation date
11/8/2017 12:06:15 PM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT AND THE MUNICIPAL WATER DISTRICT OF ORANGE COUNTY
Contract #
A-2017-222
Agency
PUBLIC WORKS
Council Approval Date
8/15/2017
Expiration Date
6/30/2018
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lines on the forms requiring data input are highlighted in green. All other lines are calculated. <br />A line -by-line explanation of the forms follows with the symbol, "tw"designating a user input, <br />and the "P" symbol designating a calculated value: <br />Worksheet 1 — Operatin.2 Plan <br />Section A - Historic Groundwater Production: Section A calculates an Adjusted Baseline that <br />is the basis against which monthly In -lieu Cyclic Storage deliveries will be measured. The <br />Adjusted Baseline should reflect the monthly pumping pattern Santa Ana would follow if it were <br />not planning to certify in -lieu deliveries from Metropolitan. The Adjusted Baseline is based on <br />historic groundwater production patterns; however, Santa Ana may adjust these patterns to <br />reflect anticipated system or operational changes during the coming operating year. <br />L Lines Al, A2, & A3 - FY Groundwater Production: Santa Ana inputs previous three <br />years monthly groundwater production data beginning one-year prior to the end of the <br />last full operating period. For example, for an agency preparing its FY 2017-18 <br />operating plan, the three years prior would include FY's 2014-15, 2013-14, and 2012-13. <br />Monthly groundwater production data includes actual pumped groundwater and imported <br />in -lieu deliveries. <br />Line A4 - 3 -Year Historical Baseline: Spreadsheet calculates Santa Ana's average <br />monthly groundwater production from the past three years. <br />Line AS - Adjustments to Baseline: Santa Ana inputs anticipated increases and/or <br />decreases in total monthly production due to factors such as new production wells <br />coming online, wells taken out of service, and/or other justifiable alterations in <br />production patterns. <br />Line A6 - Adjusted Baseline: Spreadsheet calculates Santa Ana's Adjusted Baseline for <br />the coming operating year, i.e., 3 -Year Historical Baseline with Adjustments to Baseline <br />(positive or negative). <br />As indicated above, Lines A1, A2, A3, and A5 are user inputs to be provided by Santa Ana <br />prior to the beginning of the operating year for review by Metropolitan. This review may <br />require Santa Ana provide Metropolitan with records documenting historic well production <br />and rationale for Adjustments of Baseline. <br />Section D — Planned Annual Operating Plan: Section B is Santa Ana's projection of monthly <br />imported water deliveries, groundwater production, and other local supplies that will be used to <br />meet its retail demand. The Section functions as a planning tool for Santa Ana and Metropolitan. <br />It also calculates projected In -Lieu Treated Deliveries eligible for certification as Cyclic Storage <br />based on projected groundwater production. Although only an initial estimate, once completed, <br />Section B should remain static throughout the operating year and utilized as the baseline with <br />which to evaluate the year's actual progress. <br />Line Bl - Adjusted Baseline: This line carries forward Santa Ana's Adjusted Baseline <br />calculated in Line A6. <br />O:OPSEXECICONTRADWOROGRAM FORM&KRENISHMENT AND CUP CEROKICATION DOCUMENTATION.= <br />
The URL can be used to link to this page
Your browser does not support the video tag.