Laserfiche WebLink
v. Phase 1 application fee is paid. <br />vi. A signed statement that the proposed location of the Adult -Use <br />cannabis retail business on the application meets the zoning criteria <br />established in this article including, but not limited to, any and all <br />sensitive use separation criteria required by this article. <br />d. The Director of Planning and Building or his or her designee(s) shall <br />determine whether each application demonstrates compliance with the minimum <br />requirements (above) and be placed on the RSP Eligibility List and entered into <br />the Phase 2 application and review process. <br />e. The Director of Planning and Building or his or her designee(s) shall review <br />each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be <br />notified in writing of the deficiencies. The applicant shall be given an opportunity <br />to cure any incomplete or deficient application prior to 'the conclusion of the <br />application processing term, if such time period is applicable. <br />3. Phase 2 - Regulatory Safety Permit Application <br />a. Each applicant identified on the RSP Eligibility List may choose to complete and <br />file a RSP application to the Director of Planning and Building. The application <br />shall be filed together with a nonrefundable fee as established by resolution of <br />the City Council, to defray the cost of investigation required by this article. <br />b. The RSP application period shall be open for thirty (30) calendar days and may <br />run concurrently with the Phase 1 review,period. Following the RSP application <br />period, the Director of Planning and Building or his or her designee(s) shall stop <br />accepting applications and review all applications received in Phase 2. <br />c. The Director of Planning and Building or designee(s) will review all application <br />documents required in the City's Phase 2 application package plus the additional <br />requirements in subsection (d) below. The Director of Planning and Building or <br />his or her designees) will use a merit based point system to review and rank <br />each of applications from the most to the least points and objectively award the <br />top applicants a RSP. A complete description of the merit based point system <br />and all merit based point considerations shall be included with the application <br />forms. <br />d. Phase 2 requirements include but are not limited to: <br />i. All application documents required in the City's Phase 2 RSP <br />application package. <br />Ordinance No. NS -XXX <br />11 E-21 Page 19 of 25 <br />