My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENGINEERING SOLUTIONS SERVICES (2)-2017
Clerk
>
Contracts / Agreements
>
E
>
ENGINEERING SOLUTIONS SERVICES (2)-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:18:42 PM
Creation date
11/20/2017 11:14:21 AM
Metadata
Fields
Template:
Contracts
Company Name
ENGINEERING SOLUTIONS SERVICES
Contract #
A-2017-224
Agency
PUBLIC WORKS
Council Approval Date
8/15/2017
Expiration Date
8/14/2020
Insurance Exp Date
8/19/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The funding sought is intended to support contemplated programs for, among other things: <br />• Recycled water <br />• Infrastructure replacement <br />• Automated Metering Infrastructure <br />• Green infrastructure/solar panels <br />• Conservation/outreach enhancements <br />• Sewer septic tank removals/conversions <br />The following are typical service and or items that the successful Consultant(s) will be required <br />to provide for the City of Santa Ana. <br />Funding Needs Analysis — Conduct current funding priority needs analysis and identify new <br />priority areas for funding in conjunction with Staff. <br />Outside Funding/On-Gall Research — Conduct research and identify third -party funding sources <br />that support the Public Works Agency, Water Resources Division funding needs and priorities. <br />This scope includes researching grant opportunities independently as well as any identified by <br />the City. <br />Funding Proposal Development — Provide proposal writing associated with funding applications <br />on behalf of the City of Santa Ana, Including the preparation of funding abstracts, production and <br />submittal of applications to funding sources. The City understands that many applications require <br />technical details about the water and sewer enterprises. City staff will provide technical data as <br />necessary but it is expected that the consultant(s) will perform the majority of work required to <br />generate funding applications. Once applications are finalized, consultant will provide a copy of <br />each application package for funding to the City prior to submittal and review the package with <br />City staff, <br />Pro--gram,-,Administration and Delivery — The Consultant(s) will be required to provide grant <br />administration and coordination services as part of this proposal including but not limited to <br />coordinating with City staff to provide expenditure reports, preparing Resolutions and Staff <br />Reports for City Council consideration, coordinating with funding sources staff , and submitting <br />periodic status update reports to City. <br />On a monthly basis the Consultant(s) shall provide the City summaries of potential funding <br />opportunities. The summaries shall Include, but not limited to the name of the funding agency, <br />due dates for applications, eligibility, and program summary and funding level available. <br />city Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the required <br />information in the RFP. Availability of staff time to assist with the preparation of grant application <br />documents is limited. Selected consultant is expected to perform a substantial amount of <br />research and data gathering independently. City staff will provide system information and data <br />as available in an effort to develop the best grant application package possible. <br />City of Santa Ana RFP 15-083 m <br />Page 12 <br />EXHIBIT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.