My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25O - AGMT ENGINEERING SERVICES WELL 29 REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
25O - AGMT ENGINEERING SERVICES WELL 29 REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:31:56 PM
Creation date
11/30/2017 7:30:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25O
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />WELL 29- REHABILITATION ENGINEERING DESIGN SERVICES <br />RFP NO.: 16-110 <br />Introduction and Backeround: <br />The City of Santa Ana is located in the County of Orange in Southern California. The City <br />encompasses 27.5 square miles and a population of over 340,000 people. <br />The City operates a water distribution system including over 450 miles of water main and over <br />44,000 water services. The City pumps water from the groundwater basin through an <br />existing water well network that includes 21 wells and pump stations. Well 29 is located at the <br />intersection of First Street and Flower Street. <br />It is the City's goal to rehabilitate Well 29 and to improve the site accessibility for water staff and <br />personnel to perform maintenance duties. This well is one of three wells serving the downtown <br />area and its part of the Walnut Pump Station System. A more detailed background is provided in <br />Attachment -4, Well 29 Improvements Alternative Analysis. The City has elected to move forward <br />with alternative (3) - Recommended Improvements for this well facility as defined in the analysis. <br />This project requires the development of engineering construction plans, specifications and <br />estimates for the complete rehabilitation of the well. These include: a new building structure to <br />house the electrical and mechanical components that control the pump and motor, a water <br />distribution piping system, well site and landscaping improvements, and public works <br />improvements. Specific items are identified below and in Attachment -4. <br />Description of Work: <br />The selected firm/s shall provide the City with the following services as described herein. <br />Task 1. Project Administration and Agency Coordination <br />Kick -Off Meetine <br />Upon receipt of a written Notice to Proceed from the City, the Consultant shall conduct a kickoff <br />meeting with the City Public Works Agency staff to review the Scope of Services, develop an <br />overall Project Schedule and confirm the deliverables. The Project schedule should include each <br />task, milestones, critical path designation and a schedule for progress meetings. <br />Agency Coordination <br />Well 29 is a City of Santa Ana facility and therefore, it is important to coordinate all work with <br />the City's Public Works Agency- Water Resources Division to obtain their input and include them <br />in all critical decision making. In addition, the Consultant will be required to coordinate their <br />City of Santa Ana RFP 16-110 <br />Page Al -1 <br />250-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.