My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25O - AGMT ENGINEERING SERVICES WELL 29 REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
25O - AGMT ENGINEERING SERVICES WELL 29 REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:31:56 PM
Creation date
11/30/2017 7:30:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25O
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The consulting firm/s are responsible for any damage to utilities during the locating efforts. <br />Consultant Responsibilities: <br />The consultant shall be available to provide on-call services within 48 -hours for unplanned utility <br />locating services. <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the <br />required information in the RFP. The City will provide only the staff assistance and the <br />documentation specifically in referred to herein, <br />• Location Map <br />• Water well As -Built Plans <br />• Well 29 Improvements Alternative Analysis <br />• Well 29 Functional Specifications <br />• PLC Control Panel Standards <br />• Bus Shelter Standard Plan (Detail) and Specifications <br />Fee Proposal: <br />In addition to Section IV.13.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured <br />as follows: <br />The fee proposal shall include the firm's standard hourly fee schedule, and/or <br />project fee schedule where applicable and as outlined in this this documents. <br />The fee should include all items listed on this documents. In addition; all optional <br />services such as the environmental CEQA Preparation, and the Storm Water <br />Drainage Improvements shall be listed below the base bid. <br />City of Santa Ana RFP 16-110 <br />Page Al -8 <br />250-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.