Laserfiche WebLink
The consulting firm/s are responsible for any damage to utilities during the locating efforts. <br />Consultant Responsibilities: <br />The consultant shall be available to provide on-call services within 48 -hours for unplanned utility <br />locating services. <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the <br />required information in the RFP. The City will provide only the staff assistance and the <br />documentation specifically in referred to herein, <br />• Location Map <br />• Water well As -Built Plans <br />• Well 29 Improvements Alternative Analysis <br />• Well 29 Functional Specifications <br />• PLC Control Panel Standards <br />• Bus Shelter Standard Plan (Detail) and Specifications <br />Fee Proposal: <br />In addition to Section IV.13.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured <br />as follows: <br />The fee proposal shall include the firm's standard hourly fee schedule, and/or <br />project fee schedule where applicable and as outlined in this this documents. <br />The fee should include all items listed on this documents. In addition; all optional <br />services such as the environmental CEQA Preparation, and the Storm Water <br />Drainage Improvements shall be listed below the base bid. <br />City of Santa Ana RFP 16-110 <br />Page Al -8 <br />250-20 <br />