My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25R - AGMT CENTER STREET URBAN GREENING DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
25R - AGMT CENTER STREET URBAN GREENING DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:32:45 PM
Creation date
11/30/2017 7:30:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25R
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Responsibilities: <br />The Consultant's responsibilities include the following, and shall consist of the following project <br />tasks: <br />Consultant is responsible for providing all design and engineering as required for all components <br />within the project scope of work. This includes, but is not limited to, survey, civil engineering, <br />geotechnical investigation and report (for soils analysis), infiltration testing, electrical engineering. <br />Consultant shall provide review sets in .pdf format. <br />Final plans shall be provided in AutoCAD or N icrostation format, and .pdf format, <br />Task 1: Pre Design <br />Preliminary design shall include Kick-off meeting with City Staff to discuss scope of work, project <br />goals and objectives, potential elements and issues and schedule, <br />➢ Deliverables shall include (1) rendered concept plan, <br />Task 2: Design Development (50% plans) <br />Design development will involve the schematic development of plans based upon the approved <br />conceptual design plan, which shall include architectural, landscape architectural, civil engineering, <br />draft technical specifications and "opinion of estimated cost', <br />➢ Deliverables shall include a 50% set of plans, draft specification and "Opinion of Probable <br />Cost'. <br />Task 3: Construction Documents (90% and 100%plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, final technical specifications, and a <br />finalized "Opinion of Probable Cost", <br />Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />o Erosion Control Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans And Details <br />o Planting PIans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />City of Santa Ana RFP 17-012 <br />Page Al -2 <br />25R-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.