ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />1. Substantial changes are proposed in the project which will require major revision of the previous EIR <br />due to the involvement of new significant environmental effects or a substantial increase in the severity <br />ofpreviously identified significant effects; <br />2. Substantial changes occur with respect to the circumstances under which the project is undertaken <br />which will require major revision of the previous EIR due to the involvement of new significant <br />environmental increase in the severity ofpreviously identified significant effects; or <br />3. New information ofsubstantial importance, which was not known and could not have been known with <br />the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any <br />of the following: <br />(A) The project will have one or more significant effects not discussed in the previous EIR; <br />(B) Significant effects previously examined will be substantially more severe than shown in the <br />previous EIR; <br />(C) Mitigation measures or alternatives previously found not to be feasible would in fact be <br />feasible, and would substantially reduce one or more significant effects of the project, but the <br />projectproponents decline to adopt the mitigation measure or alternative; or <br />(D) Mitigation measures or alternatives which are considerably different from those analyzed in <br />the previous EIR would substantially reduce one or more significant effects on the environ- <br />ment, but the project proponents decline to adopt the mitigation measure or alternative. <br />(CEQA Guidelines Section 15162[a]) <br />A Supplement to an EIR (or Supplemental EIR), which is narrower in scope than a Subsequent EIR, may be <br />prepared if any of the above criteria apply, but "only minor changes or additions would be necessary to make the <br />previous EIR adequately apply to the project in the changed situation" (CEQA Guidelines Section 15163[a][21). In <br />the absence of the need to prepare either a Subsequent or Supplemental EIR, an Addendum may be prepared. More <br />specifically, CEQA Guidelines Section 15164 states: <br />(a) The lead agency or a responsible agency shall prepare all addendum to a previously certified EIR if <br />some changes or additions are necessary but none of the conditions described in Section 15162 calling <br />for preparation of a subsequent EIR have occurred. <br />(b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or <br />additions are necessary or none of the conditions described in Section 15162 calling for the <br />preparation ofa subsequent EIR or negative declaration have occurred. <br />(c) An addendum need not be circulated for public review but can be included in or attached to the final <br />EIR or adopted negative declaration. <br />(d) The decision -»taking body shall consider the addendum with the final EIR or adopted negative <br />declaration prior to making a decision on the project. <br />(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should <br />be included in an addendum to an EIR, the lead agency's fundings on file project, or elsewhere in the <br />record. The explanation must be supported by substantial evidence. <br />This Addendum to the previously certified FEIS/EIR for the approved Bristol Street Widening Project has been <br />prepared because the evaluation of the proposed modifications does not result in any of the circumstances requiring <br />a Subsequent or Supplemental EIS/EIR. Although the proposed modifications would result in development that <br />differs from that in the 1990 FEIS/EIR, those modifications do not trigger the need for preparation of a Subsequent <br />or Supplemental EIR under the criteria listed in CEQA Guidelines Sections 15162 and 15163, respectively. Section <br />220 Environmental Checklist, and Section3.0 Environmental Consequences, of this Addendum demonstrate that no <br />substantial changes would result from the proposed Project modifications nor have the existing conditions in the <br />Draft I November 2017 1-2 Introduction <br />75A-17 <br />