My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />2.0 ENVIRONMENTAL CHECKLIST <br />2.1 BACKGROUND <br />1. <br />Project Title: Bristol Street and Memory Lane Intersection Improvements Project (Project No. 17-6883) <br />2. <br />Lead Agency Name and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />3. <br />Contact Person and Phone Number: <br />Kenny Nguyen, P.E. <br />Senior Civil Engineer <br />714.647.5632 <br />4. <br />Project Location: The intersection of Bristol Street and Memory Lane in the City of Santa Ana. The Project site is <br />located approximately 0.73 mile west of Interstate 5 (1-5) and approximately 0.25 mile south of State Route 22 (SR - <br />22). <br />5. <br />Project Sponsor's Name and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />6. <br />General Plan Designation: General Commercial (GC) and Low Density Residential (LR -7) <br />7. <br />Zoning: Community Commercial (Cl) and Specific Development (SD27) <br />8. <br />Description of the Project: The City proposes the widening of Bristol Street, just north of Memory Lane, to <br />accommodate a third southbound through lane at the intersection. This additional through lane would result in the <br />relocation of the existing dedicated right -turn lane slightly west. The proposed widening would involve the partial <br />acquisition of three parcels in order to accommodate the new total ROW widths (proposed to expand from 100 feet <br />to 111 feet). The proposed intersection improvements would require relocation of curb/gutter, sidewalk, driveway <br />approaches, and both public and private utilities (including the existing traffic signal). Due to the existing building <br />setback requirements, the Project would require approval from the City Manager for landscape strip Exceptions for <br />building setbacks per Municipal Code Section 41-781. The original approved 1990 FEIS/EIR proposed the same <br />intersection lanes width and configuration as that proposed. The 1990 FEISIEIR considered a 117 -foot ROW width <br />in order to accommodate the additional third through lane, specifically for the southbound travel lane. However, no <br />specific take of adjoining properties was acknowledged although the existing ROW is only 100 feet. Thus, the <br />Project changes clarify that in order to accommodate a third -through lane and bike lane, the Project requires to <br />widen the existing street ROW width of 100 feet to 111 feet, with the street section width from 84 feet to 95 feet, and <br />the partial acquisition of three properties. <br />9. <br />Surrounding Land Uses and Setting: Surrounding land uses consist of commercial and multi- and single-family <br />residential uses; refer to Section 1.2. Project Location. <br />10. <br />Other public agencies whose approval is required (e.g., permits, financing approval or participation <br />agreement). <br />• City of Santa Ana <br />Draft I November 2017 2-1 Environmental Checklist <br />75A-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.