My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and <br />historic buildings within a state scenic highway? <br />State Route 91 is located approximately 10 miles north-east of the Project site.'- The Project would not be visible <br />from SR -91. No impacts would occur in this regard. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Substantially degrade the existing visual character or quality of the site and its surroundings? <br />The proposed Project is located in a highly -urbanized area of the City of Santa Ana. The Project would widen the <br />existing roadway ROW from 100 feet to 11 I feet, resulting in additional property take for the purposes of roadway <br />use. These changes in character would be similar to those analyzed in the 1990 FEIS/EIR. Per the 1990 FEIS/EIR <br />Mitigation Measures G-1 and G-2, the Project would be compatible with the Bristol Street Widening Project <br />landscaping theme and a Xeriscape (climate appropriate landscaping) program would be considered. Existing <br />perimeter fencing along Bristol Street would be relocated and replaced in-kind with a similar aesthetic treatment. <br />These changes in character/quality would be nominal, compared to that previously considered. As such, the <br />proposed Project would not result in substantially greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: <br />G-1 A consistent theme will be developed and implemented for the landscaping within the public right-of- <br />way for Bristol Street as a part of the street widening project. <br />G-2 Consideration will be given to the implementation of a Xeriscape landscaping program. Such a <br />program would involve the use of low -maintenance, drought -tolerant plant materials, thereby reducing <br />long-term costs for maintenance and water consumption. <br />Mitigation Measures: No additional mitigation measures are required. <br />d) Create a new source of substantial light or glare, which would adversely affect day or nighttime <br />views in the area? <br />Light and glare are currently generated from various sources within the Project area (e.g., commercial and retail <br />businesses, signage, street lighting, and parking lot lighting). The proposed Project does not involve the <br />construction of any habitable structures. Relocation of the street lighting fixtures would occur. Therefore, no new <br />sources of light or glare would result with implementation of the proposed Project. The proposed Project would not <br />generate additional daytime or nighttime illumination beyond that currently experienced within the area. The <br />relocation of the traffic signal pole would be required to meet the Citywide Design Guidelines and the 1990 <br />FEIS/EIR Mitigation Measure J-1 pertaining to cut-off shielding techniques. With compliance with the 1990 <br />FEIS/EIR mitigation, the proposed Project would not result in greater impacts than previously analyzed in the 1990 <br />FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: <br />J-1 Consideration will be given to the selection of new street fixtures which have cut-off shields to <br />minimize light and glare nuisances for residential properties adjoining Bristol Street. <br />Mitigation Measures: No additional mitigation measures are required. <br />Califomia Department of Transportation, California Scenic Highway Mapping System, http://www.dot.ca.gov/ <br />hq/LandArch/16_livability/scenic_highways/index.htm, accessed August 30, 2017. <br />Draft I November 2017 3-2 Environmental Consequences <br />75A-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.