My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BRISTOL STREET PROTECTED BICYCLE LANES (4)-2017
Clerk
>
Contracts / Agreements
>
B
>
BRISTOL STREET PROTECTED BICYCLE LANES (4)-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2017 2:22:24 PM
Creation date
12/12/2017 10:43:44 AM
Metadata
Fields
Template:
Contracts
Company Name
BRISTOL STREET PROTECTED BICYCLE LANES
Contract #
A-2016-389
Agency
PUBLIC WORKS
Council Approval Date
6/7/2016
Expiration Date
12/31/2024
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-7-1860 <br />EXHIBIT C <br />M EXHIBIT C: FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />Local, atdiS �" <br />Phase <br />(ENTER ., <br />SOURCE' <br />zP `(ENTER <br />SOURCE} <br />(ENTER . <br />SOURCF1,� <br />Other <br />OCTAs <br />CMAQ funding Total ' <br />Engineering <br />$ - <br />$ - <br />$ - <br />$ - $ - $ - <br />Right -of -Way <br />$ - <br />$ - <br />$ - <br />$ - $ - $ - <br />Construction <br />$ - <br />$ - <br />$ - <br />$ - $ - $ - <br />Total <br />$ - <br />$ - <br />$ <br />$ $ - $ - <br />Project Schedule <br />Phase Proposed Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right -of -Way Acquisition <br />Right -of -Way Certification <br />Ready to Advertiso <br />Award Construction <br />Project Completion (open for use) <br />Match <br />Rate <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.