My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - TINY TIM PLAZA GENERAL PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/19/2017
>
75A - PH - TINY TIM PLAZA GENERAL PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 7:53:11 PM
Creation date
12/14/2017 7:46:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
12/19/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ER No. 2016-165, GPA No. 2017-02, AA No. 2017-03 <br />November 27, 2017 <br />Page 5 <br />The project has been designed with the community's feedback in mind using site planning <br />approaches that will minimize the project's impact on the surrounding community. The <br />proposed residential building will be located close to Fifth and Hawley streets, away from <br />single-family residences located primarily to the north and east. Moreover, the tallest <br />portion of the new building will be located the farthest away from single -,family residences, <br />minimizing visual intrusion. The new building has also been designed with angles that <br />afford view opportunities into the existing retail site from Fifth Street (eastbound and <br />westbound) and from Hawley Street (northbound). Moreover, the rehabilitation of the <br />existing commercial center does not include any intensification as the applicant proposes <br />to maintain all existing square footages. Finally, the onsite parking will be sufficient for a <br />project designed to meet affordable housing goals, and the amount of parking proposed <br />for the commercial uses exceeds the onsite parking standards required by the City's <br />transit -oriented code areas. <br />2. Will the proposed project provide dignified housing opportunities and contribute to the <br />surrounding community? <br />The proposed project meets or exceeds many of the City's existing code requirements for <br />similar projects. For example, 25 percent of the project site will feature accessible open <br />space for both residents and the surrounding community, while private residential open <br />spaces in the form of interior amenities, courtyards, and balconies will provide open space <br />to residents of the residential component. All units have been designed to feature spacious <br />kitchen and living/diningareas, reinforcing the family-oriented nature of the development. <br />On-site management will ensure that all resident needs are met and that parking is <br />managed appropriately in a timely manner. <br />The project will also rehabilitate and enhance an existing neighborhood -oriented <br />commercial center that has not undergone any significant reinvestment or upgrades since <br />it was constructed over 50 years ago. The reinvestment will create plaza areas, <br />community gardens, a performance stage, and other gathering areas that will create a <br />sense of place and gathering for the surrounding community: All components of the overall <br />site rehabilitation will be open to the public; only the resident -oriented private open space <br />areas, such as the interior courtyard, laundry rooms, community rooms, and similar <br />spaces, will be secured for resident access only. <br />3. Is the project compatible with the 2014 Housing Element and the future vision for its <br />setting? <br />The project site was identified in the City's 2014 Housing Element "Available Land for <br />Housing" section. The Fifth Street corridor sub -area was identified as containing 14 acres <br />of underutilized property near the future Fixed Guideway (streetcar) that is ripe for transit - <br />oriented development. Further, the Element identifies the area as an opportunity to <br />75A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.