ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />• East. Memory Lane continues east of the Project site Commercial uses (Floral Park Promenade located to <br />the east and northeast and a Shell gasoline service station located to the east and southeast) are present <br />These properties are all designated GC and zoned Cl. Further southeast of Shell, single-family residential <br />uses (designated LR -7 and zoned Single -Family Residence [R1]) arepresent <br />• South: Bristol Street continues south of the Project site Commercial uses (die Shell gasoline service <br />station located to the south and southeast and a strip -mall with neighborhood serving retail uses located to <br />the south and southwest) are present All of these properties are designated GC and zoned Cl. Further <br />southeast of Shell, Casa de Santiago single-family residential uses (designated LR -7 and zoned RD are <br />present <br />• West Memory Lane continues west of the Project site Vacant land (designated GC and zoned Cl) is <br />situated to the west of the Project site and further west is the Portofino Apartments (designated LR -7 and <br />zoned Specific Development [SD27]). Islander Apaurnents (designated LR -7 and zoned CD are situated to <br />the west and northwest of the Project site <br />As shown on Exhibit 3, Exi tine Land Uses (1990 FEISIEIR), these land uses have not substantially changed since <br />preparation of the 1990 FEIS/EIR. It is acknowledged that the 1990 FEIS/EIR did not include land uses north of <br />Memory Lane in the applicable figures. In order to provide information on land uses north of Memory Lane, <br />Exhibit 3 also identifies these curent land uses. These curent land uses have not substantially changed since the <br />1990 FEIS/IIR, as the 1990 FEIS/EIR considered the surounding land uses to include a mix of commercial and <br />residential development <br />1.3 PROJECT BACKGROUND <br />1.3.1 APPROVED 1990 FINAL EIR/EIS <br />The City of Santa Ana General Plan designates Bristol Street as a Major Arterial Highway traveling in a north -south <br />direction. As a result of significant growth and traffic congestion on Bristol Street, the City of Santa Ana, in the late <br />1980s, proposed to widen Bristol Street from a four -lane roadway to a six -lane arterial in accordance with adopted <br />County of Orange and City of Santa Ana standards for a Major Arterial Highway. A joint EIS/EIR was prepared <br />and approved by the City of Santa Ana and the California Department of Transportation (Caltrans) for the widening <br />of Bristol Street in 1990. The 1990 Bristol Street Widening Project entailed a 3.9 -mile segment of Bristol Street <br />from Warner Avenue to Memory Lane The Project site is situated within the northem-most portion of Bristol <br />Street, previously analyzed in the 1990 FEIS/EIR as the segment from Seventeenth Street to Memory Lane <br />However, due to significant costs associated with construction and availability of funding the Bristol Street <br />Widening Project was divided into multiple segments and phases, compared to that analyzed in the 1990 FEIS/EIR: <br />• Phase 1, from McFadden Avenue to Pine Street; <br />• Phase II, from 3`tl Street to Civic Center; <br />• Phase IIIA, from Civic Center to Washington Avenue; <br />• Phase 11113, from Washington Avenue to 17a' Street; and <br />• Phase IV, from Warner Avenue to St Andrew Place <br />The Bristol Street Widening segments operate independently; operation of one segment is not dependent on another. <br />It is acknowledged that prior to dividing the Bristol Street Widening Project for funding purposes, construction of <br />some sections was completed and was not included in the phasing described above, including the following: <br />• St Andrew Place to McFadden Avenue; <br />• Elm Street to Memory Lane; and <br />• Pine Street to 3`6 Street <br />The segment between 17a' Street and Elm Street is not funded; therefore, no phasing has been identified. <br />Final I December 2017 1-6 Introduction <br />