My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-077 - Approving an Addendum to the Final Environmental Imapact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-077 - Approving an Addendum to the Final Environmental Imapact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 2:34:15 PM
Creation date
12/18/2017 4:15:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-077
Date
12/5/2017
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />1.4.3 CHANGES AS COMPARED TO THE APPROVED PROJECT <br />It should be noted that Project phasing has been revised from the original phases identified in the 1990 FEIS/EIR. <br />As discussed in Section 1.3.1 Approved 1990 Final FIR/FIS. construction phasing of the entire Bristol Street <br />Widening Project has been further subdivided as follows: <br />• SL Andrew Place to McFadden Avenue(Constructed in 2002); <br />• Elm Street to Memory Lane (Constructed in 2003); <br />• Pine Street to 3`a Street (Constructed in 2009); <br />• Phase I: McFadden Avenue to Pine Street (Constructed in 20111); <br />• Phase II: 3`6 Street to Civic Center Drive (Constructed in 2014); <br />• PhaseIIIA: Civic Center Drive to Washington Avenue; <br />• Phase 11113: Washington Avenue to 17a Street hinder construction); <br />• Phase IV Warner Avenue to St Andrew Place; and <br />• Phase V: 17v' Street to Elm Street <br />The proposed intersection improvements (proposed Project addressed herein) differs from the original configuration <br />of the 1990 FEIS/IIR, as follows: <br />• As shown on Exhibit 4 and Exhibit 5 Bristol S/reetl1kmory Lane Intersection Confleurrdion (1990 <br />FEISIEIR), the original approved 1990 FEIS/EIR proposed the same intersection lane configuration as that <br />proposed. As shown on Exhibit 5, the 1990 FEIS/EIR considered a 117 -foot ROW width in order to <br />accommodate the additional third through lane, specifically for the southbound travel lane However, no <br />specific take of adjoining properties was acknowledged although the existing ROW is only 100 feet Thus, <br />the Project changes clarify that in order to accommodate a third -through lane, the Project requires to widen <br />the existing street ROW width of 100 feet to 111 feet, with the street section width from 84 feet to 95 feet, <br />and the partial acquisition of three properties. <br />Although the proposed lane configuration was analyzed in the 1990 FE IR, necessary partial ROW <br />acquisition to accommodate this configuration was not considered. Proposed ROW acquisition would be <br />required on the west side of Bristol Street, north of the intersection of Bristol Street and Memory Lane. As <br />depicted on Exhibit 5 Nese Assessor Parcel Numbers (APNs) include 002-261-06, -29, and -30. Areas of <br />proposed ROW acquisition consist of vacant land, omamental landscaping and areas of paved driveway; <br />no modification/demolition of habitable structures would be required as part of these new partial <br />acquisitions to accommodate the Project The Project would also accommodate a bike lane and relocate the <br />existing perimeter fencing along Bristol Street and may include an extension of the existing stomp water <br />pipeline system (located on the eastem side of Bristol Street) through a new lateral connection and new <br />catch basin at the Project site <br />An assessment of construction and Project -related GHG emissions and potential impacts to tribal cultural resources <br />was also not addressed in the 1990 FEIS/EIR, and as a result is addressed in this Addendum. <br />1.4.4 CONSTRUCTION TIMEFRAME <br />Construction activities associated with the proposed Project would occur following acquisition of the required <br />parcels. The Project proposes a 12 -month construction period (anticipated to be completed by December 2019). <br />However, it is acknowledged that the Project could be constructed in multiple phases, depending on funding. <br />1 Phase numbers were assigned to the Bristol Street Widening Project subsequent to cancelation of the CenterLine <br />Light Rail Transit Project and associated reallocation of funding from that canceled project to the Bristol Street Widening <br />Project. <br />Final I December 2017 1-10 Introduction <br />
The URL can be used to link to this page
Your browser does not support the video tag.