My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-077 - Approving an Addendum to the Final Environmental Imapact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-077 - Approving an Addendum to the Final Environmental Imapact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 2:34:15 PM
Creation date
12/18/2017 4:15:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-077
Date
12/5/2017
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />,) For a project within the vicinity of aprivate airship, would the project result is a safety hasardfor <br />people residing or working in the project area? <br />The Project site is not within the vicinity of a private airstrip and would not create any safety hazard. The proposed <br />Project would not create additional significant impact Impacts in this regard would not be greater than that <br />previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />g) Impair implementation of or physwaIIy utterfere wide an adapted emergency response plan or <br />emergency evacuation plan? <br />During construction, the disruption of traffic and access along Bristol Street and Memory lane would temporarily <br />affect the mobility of emergency vehicles. However, provisions would be made for interim access through the <br />Project corridor and to adjoining properties; traffic control plans would be prepared detailing provisions for <br />vehicular movement and access through the Project corridor during construction. Advance warning and information <br />signs would be used to inform motorists during the construction process. It is expected that two-way travel would <br />be maintained along Bristol Street during construction. Although the proposed Project may interfere with an <br />emergency evacuation plan, it would be short term during construction and mobility would improve once the Project <br />is completed. Compliance with mitigation measures from the 1990 FEIS/EIR would ensure that impacts are not <br />greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures <br />V-10 Traffic control plans will be prepared prior to each phase of construction. All traffic warning and <br />control devices should comply to the provisions of the State of Califomia Manual of Traffic Controls. <br />V-12 Thepolice and fire departments will benotified of construction at least one (1) month in advance, as to <br />the particulars of the project (i.e., project time schedule, and areas to be dismpted, etc.). This action <br />would give the police and fire departments sufficient time to notify its personnel of any significant <br />impediments to traffic. <br />V-13 The City will notify the police department at least 48 hours in advance of any turning changes. A <br />minimum three (3) signs are required for each indicated change and/or prevention of movement <br />V-16 If feasible, construction activities and lane closures will occur primarily during non -peak driving <br />periods. <br />Mitigation Measures: No additional mitigation measures are required. <br />h) Expose people or shvchwes to a significant risk of Loss, ugury or death uwolvurg midland fines, <br />inchu ing where midlands are adjacent to urbanized areas or where residences are intermixed wide <br />wildlands? <br />The proposed Project is located in a highly -urbanized area of the City of Santa Ana. There are no wildlands in the <br />Project vicinity and no new significant impacts would result with Project implementation. Impacts in this regard <br />would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />Final I December 2017 3-16 Environmental Consequences <br />
The URL can be used to link to this page
Your browser does not support the video tag.