My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-077 - Approving an Addendum to the Final Environmental Imapact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-077 - Approving an Addendum to the Final Environmental Imapact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 2:34:15 PM
Creation date
12/18/2017 4:15:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-077
Date
12/5/2017
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />projected capacity to serve residents and businesses until approximately 2030.1/ Olinda's average disposal rate is <br />nearly 7,000 tons per day (TPD), although it permitted up to 8,000 TPD. Thus, these facilities have adequate <br />landfill capacity to serve the proposed Project and no new significant environmental impact would result from the <br />Project implementation. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />g) Comply wdhfederedstore, mulloeal starmesand regulations relatedto solid mule? <br />Refer to Response 3.18(f). The proposed Project would comply with all applicable federal, state, and local statutes <br />and regulations related to solid waste. The Project would comply with the City of Santa Ana's established <br />reduction, reuse, and recycling programs. No new significant solid waste impact would result from the proposed <br />Project Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />3.19 MANDATORY FINDINGS OF SIGNIFICANCE <br />Based on this Addendum, the proposed Project has not substantially changed in regard to the setting, design, <br />impacts, and mitigation measures as described in the 1990 FEIS/EIR New circumstances or new information, <br />including any new or revised environmental laws, regulations, or policies have not modified the impacts of the <br />proposed Project <br />a) Does the project have the potential to degrade the quality of the environment substaetatly reduce <br />the habitat of a fish or wtldhfe species, cause a fish or wtldhfe population lo drop below self- <br />suRaining levels, threaten to eliminate a plant or mhhnal commnmrtg substa thatly reduce the <br />number or restrict the range of a rare or endangered plant or animal or eliminate important <br />examples of the major periods of California history or prehistory? <br />The proposed Project would not result in impacts beyond those identified in the 1990 FEIS/EIR in this regard, and <br />does not have the potential to degrade the environment, reduce the habitat of a fish or wildlife species, threaten plant <br />or animal communities, reduce or restrict endangered plant or animal species or eliminate important examples of <br />major periods of California history or prehistory with compliance with the 1990 FEIS/EIR mitigation measures. <br />b) Does the project have impacts that are individually, tumind bad camelatvely considerable? <br />('Cumulatively considerable" means that the incremental effects of ¢project are considerable when <br />viewed in connection with the effects of past projects, the effects of other current projects, and the <br />effects ofprobablefutu re projects)? <br />Given the nature and scope of the proposed Project, and in consideration of mitigation measures that are included in <br />the 1990 FEIS/EIR, the Project would not involve impacts that are cumulatively considerable <br />C) Does the project have environmental effects which will cause substantial adverse effects on human <br />beings, either directly or indirectly? <br />Construction -related activities are anticipated to have some relatively minor, temporary impacts which can be <br />mitigated with implementation of measures included in the 1990 FEIS/EIR Furthermore, potential long -tern <br />(operational) impacts would be reduced to less than significant levels through implementation of required 1990 <br />FEIS/EIR mitigation measures. <br />Orange County Waste and Recycling, Olinda Alpha Landfill, hltp://www.oclandfills.coMlmdfill/acfive/ <br />olindalandfill, accessed October 16, 2017. <br />Final I December 2017 3-30 Environmental Consequences <br />
The URL can be used to link to this page
Your browser does not support the video tag.