My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO CONSULT DESIGN SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
01/16/2018
>
55C - RESO CONSULT DESIGN SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 7:12:46 PM
Creation date
1/11/2018 7:05:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
1/16/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />eIr <br />D E 5 I G N EXHIBIT DESIGN • ARCHITECTURE• LANDSCAPE ARCHITECTURE <br />mark e. Beauchamp, asla • gre0ory). dykstra, ala •Jdn stefdnsson, asla • gregg Is. lelcester, asla <br />November 27, 2017 <br />Ms. Suzi Furjanic <br />Project Manager <br />City of Santa Ana - Public Works Agency <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />Sent via email <br />Re: Giant Otter Project <br />Additional Services Proposal — Howler Monkey Expansion <br />Dear Suzi, <br />We appreciate the opportunity to submit this proposal for additional work in support of the Giant Otter <br />Project. In collaboration with our team of design and engineering consultants, we are poised to lead the <br />City and Santa Ana Zoo in this effort. We understand how important it is to develop a fully coordinated <br />and comprehensive plan for this project at the heart of the SAZ campus. We look forward to the <br />challenge and opportunity to integrate new primate habitats in a way that meets both immediate <br />husbandry needs and aligns with the long-range Master Plan objectives. <br />We propose the following terms/assumptions for your review and approval: <br />Scope: As part of our current Contract, we have developed schematic level documents for the <br />original scope of work desired, which included a renovation to Amazon's Edge to house Giant <br />Otters, and incorporation of new experiences and encounters for guests, as well as the <br />necessary facilities and systems for keepers and animal support. As requested during Task 2 of <br />the design process, CLR explored the possibilities of incorporating Howler Monkey's into the <br />scope of work. Through on-site design workshops, the CLR/Zoo/City/FOSAZ planning team <br />discussed potential ways to incorporate monkeys in a dynamic, innovative way that would <br />promote natural behaviors and meet or exceed today's husbandry and welfare standards. The <br />plan below illustrates the desired scope of work which includes the following: <br />o Renovation of Amazon's Edge to house Giant Otters, including a new deep pool and <br />stream course, water filtration system (25K -30K gallons), back of house building <br />renovations, underwater viewing, and guest trail and landscape enhancements. This is <br />part of the original scope of work. <br />o New elevated monkey trail system at approximately 315 linear feet. <br />o New mesh enclosed monkey habitats at 560 sf and 1,440 sf. <br />o Small roof structures in visitor areas below monkey trails to provide physical separation <br />between guests and animals. <br />o Project site/limit of work expansion to the east to allow for additional primate habitat <br />area and landscape integration. <br />t 215.564.0250 • 1215.564.1154. w w.clydeslgn.com . 633 chestnut street, suite 1000 • phlladelphla, pa 19107 <br />34921 calle del sol • capistrano beach, ca 92651 <br />55C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.